1 / 23

Design and Test of the First Article Accufix 7500 Transmitter

Design and Test of the First Article Accufix 7500 Transmitter. Presented by Mark Danieli. Need for New Transmitter. Factors leading to decision for new transmitter Goals for new transmitter . Factors Leading To Decision For New Transmitter. TTX not supportable in near term

howell
Download Presentation

Design and Test of the First Article Accufix 7500 Transmitter

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Design and Test of theFirst Article Accufix 7500 Transmitter Presented by Mark Danieli

  2. Need for New Transmitter • Factors leading to decision for new transmitter • Goals for new transmitter

  3. Factors Leading To Decision For New Transmitter • TTX not supportable in near term • TTX/SSX do not support additional capabilities (i.e. IFM) • Cost reduction associated with fewer personnel requirements • Unmanned Stations • Remote Control

  4. Goals for New Transmitter • Increase individual HCG output power through component improvements • Modernize Control Console - TCS • Make the number of DHCs variable and assignments flexible • Future incorporation of IFM has minimal impact on system architecture • Maximize commonality with existing USCG assemblies

  5. Accufix 7500 Transmitter Overview

  6. Improved Architecture • Prime Power Distribution Unit • Pulse Generator Assembly • Switch Network Assembly • Coupling Cabinet Assembly • Transmitter Control Subsystem (TCS)

  7. Prime Power Distribution Unit

  8. Prime Power Distribution Unit • Provides emergency shutdown, at the site and via remote control • Configuration dependent on the number of HCGs in transmitter • Each subsystem has a dedicated breaker

  9. Pulse Generator Assembly

  10. Pulse Generator Assembly • PGA consists of 4 HCGs • Component modernization: • Fire detection module linked to TCS • HCG Assembly • Power Supply Reengineering • Card Cage / Circuit Boards • Backplane PCB • Module connections • Increased Capacitance (Droop)

  11. HCG Power Supply 6500 Series 7500 Series Control Logic Boards

  12. Pulse Generator Assembly (Con’t) • Megatron Charger Assembly • A4 Resistor Board • Connector Replacement • Megatron Assembly • Oil filling Connector • Snubber Board Addition • Higher Power Diode • Connector Replacement

  13. Switch Network Assembly

  14. Switch Network Assembly • 3 second switchover • Switch modules interchangeable • New lightning arrestor • Redundant DHC and Antenna current feedbacks • Service Life Extension Program (SLEP)

  15. Coupling Cabinet Assembly

  16. Coupling Cabinet Assembly • Total Redesign – symmetric • Reduced footprint • Modular • Electrically a hybrid between the 6500 and the AN/FPN-64 • Circuit breakers now used in place of fuses

  17. Benefits • Increased Output Power/higher efficiency • Increased flexibility • More robust ECD control • Improved Timing Stability

  18. Work In Progress • Ongoing development • Future software enhancements • Refined fail soft • Signal Quality Analyzer (SQA)

  19. Factory System Acceptance Testing • Performance Measurements • Test and Demonstration Tasks

  20. Transmitted Signal Performance Measurements • Envelope Shape Measurements • Amplitude measurements for positive and negative phase-coded pulses • RF Zero Crossing Measurements • Specifications relates more the timing accuracy of the output pulses rather than to phase accuracy • Spectrum & Harmonics Measurements • Power Input Measurements • IAW COMDTINST M16562

  21. Performance Measurements

  22. Test and Demonstration Tasks • Single Rate Test • Dual Rate Test • HCG Failure Recovery Test • Switch-over Test • 120-Hour Burn-In Test

  23. Summary • 16 HCG Transmitter for USCG LSU • FSAT completed in October 02 • Installation completed in November 02 • 48 HCG Transmitter for LORSTA George, WA • FSAT in December 02 • Installation in January 03 • 16 HCG Transmitter for LORSTA Kodiak, AK • In process • USCG Support

More Related