City of Tacoma

City of Tacoma. Public Meeting April 10, 2014. Jim Parvey, P.E ., LEED AP City of Tacoma Senior Principal Engineer. Design Manual Update. Need For Update. Manual last updated in 2004. Changes in Surface Water Regulation require manual to be reviewed and updated as needed.

hoyt-chan
Download Presentation

City of Tacoma

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. City of Tacoma Public Meeting April 10, 2014 Jim Parvey, P.E., LEED AP City of Tacoma Senior Principal Engineer Design Manual Update

  2. Need For Update • Manual last updated in 2004. • Changes in Surface Water Regulation require manual to be reviewed and updated as needed. • Opportunity to update other sections of manual.

  3. NPDES LID Code Revision Public Meeting April 10, 2014 Merita Trohimovich, P.E. City of Tacoma Surface Water Engineer

  4. S5.C.5 b LID Code-related Requirements The intent of the code revisions shall be to make LID the preferred and commonly-used approach to site development. Revisions shall be designed to: • minimize impervious surfaces, • minimize native vegetation loss, and • minimize stormwater runoff in all types of development situations.

  5. LID Code Updates Approach Direct Approach: All projects shall complete LID feasibility analysis and implement to maximum extent feasible. Tacoma’s Proposed Approach: • Remove barriers; • Make equivalent guidance; • Add incentives; • Provide equivalent manual; and • Lead by example.

  6. Code Update Process Guidance

  7. Tacoma’s Process • Reviewing all development codes, regulatory and guidance documents • Partnering with planning department using existing process for code adoption • Using Standards Committee existing process to update Public Works Design Manual • Creating internal work groups • Public outreach

  8. Work to Date • Process and schedule developed • Staff, manager, supervisor education • Team on board • Team educated • Beginning public education • Beginning actual work of code review and revision

  9. LID Design Needs What is needed to implement LID? • Additional training and technical support • Additional details and pre-engineered sizing • Site assessment and design guidance • Guidance for minimizing impervious surfaces • Tree retention and protection specifications • Methods for retaining native vegetation • Soil testing assistance • Training workshops • Online information

  10. Choosing LID What would help you choose LID over traditional stormwater options? • Faster permit review • Reduction of permit fees • Allowance to modify design elements (additional height, ability to decrease setbacks, lower parking requirements, less landscaping) • Reduction in surface water fees • Training and Education • Other?

  11. Contact Information Merita Trohimovich City of Tacoma Surface Water Group 253-502-2103 mtrohimo@cityoftacoma.org Contact me for suggestions, questions and to get involved.