PART TOW. BIM. Building. Information. Modeling. introduction. What is BIM ?. - Digital representation of a physical and functional characteristics of a building . - Collaboration of team members that delivers improved overall success for the project.

hubert
Download Presentation

PART TOW

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. PART TOW BIM Building Information Modeling

  2. introduction

  3. What is BIM ? - Digital representation of a physical and functional characteristics of a building . - Collaboration of team members that delivers improved overall success for the project. - Shared archive of building information data

  4. Why Should I Use BIM? • Earlier decision-making • Better documentation & Collaboration • Evaluation of design analysis prior construction • And More ….

  5. Before beginning The collaborative project delivery methods as design-build or at-risk CM is more appropriate for BIM • Delivery method and BIM . • Intelligent model

  6. Intelligent VS unintelligentmodel Intelligent 3D Unintelligent 3D

  7. Before beginning • Delivery method and BIM . • The collaborative project delivery methods such as design-build or at-risk CM is more appropriate. • Intelligent model • software's

  8. SOFTWARES

  9. Before beginning • Delivery method and BIM • Intelligent model • software's • The model • When BIM is used ?who will use the BIM?

  10. WHEN? AND WHO? • Project conception /pre design • Initial design • Details design • Construction documentation • Construction • Occupancy (facility management ) Designer Designer contractor engineers Builders Owner

  11. Site Coordinaontiplan • 4D Scheduling and Sequencing • Images • Walkthrough animation • Sun path study animation • drawings • Schedules • Schedules • Skybim take-off software • LBS • Shop drawings , RFIs , submittals • Bussaw • Collaborate feature in revit • Trades Coordination and clash detection • Design Visualization • Quantities Take off and Estimating • Collaboration • Applications of BIMin Construction Management

  12. Design Visualization • Images • Walkthrough animation • Sun path study animation • Drawings • 3D • Schedules

  13. Design Visualization • All from one resource • Easy and fast • Magnificent Interoperability

  14. Cad-based VS BIM 20-story building Full drawings , sections , details and schedules

  15. Design Visualization • All from one resource • Easy and fast • Magnificent Interoperability • Import / Export to Multiple File Formats

  16. Visualization and management • Good visualization • clear and Stable Design • Less change orders and mistakes • Good management Shop drawings , RFIs ,

  17. Site Coordination plan

  18. Revit Schedules • Skybim take-off software Quantities Take off and Estimating Are As Easy As Clicking A Button • Quantities Take off and Estimating

  19. Revit SCHEDULES

  20. Skybim take-off software

  21. Shop drawings , RFIs , submittals • Collaboration WEB-BASED • SOFEWARES • Collaborate feature in revit COMUNICATION PLAN • Collaboration

  22. Collaboration WEB-BASEDSOFEWARES PROJECT (1) PROJECT (2) PROJECT (3)

  23. Shop drawings & RFIs

  24. Collaborate feature in Revit

  25. Trades Coordination and clash detection Architecture engineer Structure engineer Mechanical engineer Electrical engineer

  26. Clash detection report

  27. Location-based schedule (LBS)

  28. 4D simulation

  29. https://sites.google.com/site/mygproject hiat4ever@gmail.com

  30. summary of BIM results

  31. THANKS