Data Analysis & Simulation Issues Theo Alexopoulos, NTUA Planning meeting, 14.03.2012. Test beam activities (@H6, July & Oct 2012 periods ) Simulation. Test beam analyses e xisting analyses: ALTRO, APV, old BNL elx s hort-term needs: need software for BNL VMM1 chip; MM in ATLAS
E N D
Data Analysis & Simulation Issues Theo Alexopoulos, NTUA Planning meeting, 14.03.2012
Test beam activities (@H6, July & Oct 2012 periods) • Simulation Test beam analyses existing analyses: ALTRO, APV, old BNL elx short-term needs: need software for BNL VMM1 chip; MM in ATLAS long-term needs: develop a tracking program short-term: July 2012 Simulation issues existing analyses: homemade standalone MC for NSW emphasizing on timing trigger studies short-term needs: optimize the trigger schema parameters; trigger scheme for FPGA implementation long-term needs: Integration of MM-MC into Athena framework
TEST BEAM SETUP Oct2011 (14.10.2011-21.10.2011) Jura 300 run<=6989 322 7007<run>=6990 16.10..2011, 11:30 425 78 113 78 TOP VIEW 1406 CR2-r Large mm μM-R20 stripsX μM-R18 stripsY μM-R21 stripsYX veto Sci s360 s360 44 725 2 2 Beam profile wire chamber x 100 10 20 20 20 μM-R19G stripsXUV s640 z 26 26 26 15 finger Sci (SA) y 170 10 2 s1 Si1 Si3 SC Si6 SB (π-,+120GeV/c) Y-inverted SB SD s1 s1 s1 Saleve movable table 16 4730 SIDE VIEW y s1 s1 s640 s1 26 26 26 z x x s640 s640 s1 Si1 Si6 Si3 50 (π-,+120GeV/c) Y-inverted s360 1155 New movable table 16.10.11 19:30 rotate chambers by 20 degrees μM-R18 (X-Y) used only as Y-strip chamber
Past test beam periods: • Nov 11: n run @ Garching • Oct11: R20, R18, R19G, R21, CR2; beam: π+120 GeV/c; position scan, HVdrift scan, angular scan, 93:7 & 85:15, at the end run MBT0 for few hrs; APV • Jul11: R14, R18, R9M, R19G, CR2, BNL-MM, LMU-MM telescope; beam: π-120 GeV/c; position scan, HVmesh scan, HVdrift scan, angular scan, target study, 93:7 & 85:15; APV, oldBNL-elx • Jan11: n run @ Demokritos • Oct10:R11, R12, R13, R14, R15; beam: π+80 GeV/c; position scan, HVmesh scan, HVdrift scan, angular scan, 93:7 & 85:15; APV • Jul10: R11, R12, R13, P3; beam: π+120 GeV/c; position scan, HVmesh scan, HVdrift scan, angular scan, 93:7 & 85:15; ALTRO, oldBNL-elx on R13 • Nov09: P1, P3, R3, R4, S2(MM+GEM), Saclay MM Telescope; beam: π+120 GeV/c; position scan, HVmesh scan, HVdrift scan, angular scan, 93:7 & 85:15; ALTRO, oldBNL-elx • Sep09: n run @ Demokritos • Jul09: P1, P2, smallMM; beam: π+120 GeV/c; HVmesh scan, HVdrift scan, angular scan, T2K gas (Ar:CH4:Isobutane - 95:3:2) Small Micromegas on Ar:CO2