1 / 13

Annual Workshop on Crystal Collimation H8 Layout and infrastructure

Annual Workshop on Crystal Collimation H8 Layout and infrastructure. Bld 887: H8 beam line. Experimental Area 138. Experimental Area 138. Experimental Area 138. Cables from control room HNA443: 10 coaxial cables (BNC connectors) 4 HV coaxial cables (SHV connectors)

huey
Download Presentation

Annual Workshop on Crystal Collimation H8 Layout and infrastructure

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Annual Workshop on Crystal CollimationH8 Layout and infrastructure J.LENDARO EN/STI/ECE

  2. Bld 887: H8 beam line J.LENDARO

  3. Experimental Area 138 J.LENDARO

  4. Experimental Area 138 J.LENDARO

  5. Experimental Area 138 • Cables from control room HNA443: • 10 coaxial cables (BNC connectors) • 4 HV coaxial cables (SHV connectors) • 1 Ethernet cable (RJ45 connectors) • Services available inside the area: • AC power 230V • 2 Ethernet outlets J.LENDARO

  6. Experimental Area 128 J.LENDARO

  7. Experimental Area 128 J.LENDARO

  8. Experimental Area 128 J.LENDARO

  9. Experimental Area 128 • Cables available from control room HNA443 • 4x coaxial cables (BNC connectors) • 4x HV coaxial cables (SHV connectors) • 2x Ethernet cable (RJ45 connectors) • 1x I2C control cable • Several optical fibers have been installed in September 2010. (Thanks to EN-EL-CF) • 12x Multimode fibers (ST connectors) • 36 single mode fibers with E2000/APC connectors • Services available inside the area: • AC power 230V: Will be consolidated during winter shutdown • Network: installation during winter shutdown J.LENDARO

  10. Control room HNA443 J.LENDARO

  11. September 2010 Optical fibers panel Optical fibers panel J.LENDARO

  12. September 2010 J.LENDARO

  13. Thank you ! J.LENDARO