1 / 10

Startup/Shutdown Procedures

Startup/Shutdown Procedures. Startup. Turn on the computer monitor and verify that the TJ application is running. Startup (Cont.). From the TJ application, check the drum temperature; it should be between 30°C - 32°C.

Download Presentation

Startup/Shutdown Procedures

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Startup/Shutdown Procedures

  2. Startup • Turn on the computer monitor and verify that the TJ application is running. Confidential

  3. Startup (Cont.) • From the TJ application, check the drum temperature; it should be between 30°C - 32°C. • Verify that the application computer does not indicate any error messages. Confidential

  4. Maintenance position Startup (Cont.) Using solvent, printing heads gently from right to left Order the bridge to maintenance position via the RTRun software Remove the night cover 4. Confidential

  5. Startup (Cont.) • Make sure that the bridge is at the center or on the right side. • Select the On button in order to initialize the Machine. Confidential

  6. Shutdown: Preparing the Foam Night Cover • Perform the first time only: • The foam night cover has two distinct sides: • The side that covers the inkjet heads is made of foam. • The other side (facing the drum) is made of hard plastic. • Cut the polyethylene sleeve to length. • Insert the entire length of the foam night cover into the sleeve so as to completely cover it with the polythene. • Fold the ends of the polyethylene sleeve towards the back of the night cover and stick it together with adhesive tape. Confidential

  7. 48V Maintenance position Shutdown • Set the drum to IDLE. • Shut off the 48V (from the RT Software main screen). Confidential

  8. Shutdown (Cont.) Using the solvent, clean the heads and cover them with polyethylenestretch film. Place the bottom of the night cover into the ink drain at the bottom of the bridge. 3. Confidential

  9. Shutdown (Cont.) • From the RTRun application (Main window) click Off. • Wait for the bridge to complete its forward movement. • Push the bridge, manually, all the way towards the drum. Confidential

  10. Shutdown (Cont.) • Turn off the printer via the TJ application. • Check that the actual temperature is OK. • Turn off the computer monitor. • Go home. Confidential

More Related