The PHELIX Control System PCS Stefan Götte PHELIX GSI Helmholtzzentrum für Schwerionenforschung GmbH CS-Workshop GSI February 28th, 2013
Beamtime: only 10% downtime 68% of the time related to experiments (total 18: 8 @ Z6, 7 @ PLH, 3 @ xRay-Lab) rest: internal Shot statistics: 3556 shots in total 80 failures (2,2%) 2365 experiment shots 27 failures (1,1%) PHELIX in 2012
OS: Windows XP LabVIEW 2009 CS-V3.21 running on 23 nodes (20 PCS, 1 developer, and 2 hardware test nodes) 25 executables (four types) 70 PHELIX classes about 350 instances about 10000 process variables the PCS is (still) one of the largest CS applications The PCS: Facts and Numbers
Sequencer 48 controls, 114 indicators 12 states (SM) 43 methods 401 user VIs Beamline 177 controls, 163 indicators 40 methods 309 user VIs PILS 16 controls, 203 indicators 16 methods 262 user VIs PCS: Working Horses
(Remote) reboot* Autologin* Copy executables* DSC-Engine* (Remote) start of PCS* Laserfreigabe *: if necessary Switch it on …
select the subsystem check the beam position align the beam check parameters easy enough for scientists … … align it …
Search PLH PreAmp- and MainAmp-Freigabe Set parameters Checklist Shot Afterwards in case of a failure: … make a shot …
Status: PHELIX uses old DSC engine (LV 7.1) for Beckhoff Problem: SIEMENS OPC Server is not running with modern DSC-Engine Solution: direct connection to Beckhoff (ADS DLL) Hardware: BK9050 (twisted pair) Software: New class Latest News: Getting rid of the DSC-Engine
new classes … migration to new(er) LabVIEW version … next operating system … Helmholtz beamline … … Outlook