An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. The PHELIX Control System PCS Stefan Götte PHELIX GSI Helmholtzzentrum für Schwerionenforschung GmbH CS-Workshop GSI February 28th, 2013

  2. Beamtime: only 10% downtime 68% of the time related to experiments (total 18: 8 @ Z6, 7 @ PLH, 3 @ xRay-Lab) rest: internal Shot statistics: 3556 shots in total 80 failures (2,2%) 2365 experiment shots 27 failures (1,1%) PHELIX in 2012

  3. OS: Windows XP LabVIEW 2009 CS-V3.21 running on 23 nodes (20 PCS, 1 developer, and 2 hardware test nodes) 25 executables (four types) 70 PHELIX classes about 350 instances about 10000 process variables the PCS is (still) one of the largest CS applications The PCS: Facts and Numbers

  4. Sequencer 48 controls, 114 indicators 12 states (SM) 43 methods 401 user VIs Beamline 177 controls, 163 indicators 40 methods 309 user VIs PILS 16 controls, 203 indicators 16 methods 262 user VIs PCS: Working Horses

  5. Sunrise at the control room …

  6. (Remote) reboot* Autologin* Copy executables* DSC-Engine* (Remote) start of PCS* Laserfreigabe *: if necessary Switch it on …

  7. select the subsystem check the beam position align the beam check parameters easy enough for scientists … … align it …

  8. Search PLH PreAmp- and MainAmp-Freigabe Set parameters Checklist Shot Afterwards in case of a failure: … make a shot …

  9. … and check the results.

  10. Sunshine after the Shot …

  11. Status: PHELIX uses old DSC engine (LV 7.1) for Beckhoff Problem: SIEMENS OPC Server is not running with modern DSC-Engine Solution: direct connection to Beckhoff (ADS DLL) Hardware: BK9050 (twisted pair) Software: New class Latest News: Getting rid of the DSC-Engine

  12. new classes … migration to new(er) LabVIEW version … next operating system … Helmholtz beamline … … Outlook