Dredging, Wetlands Creation, & Ecosystem Protection: Finding the Right Balance for SF Bay

Dredging, Wetlands Creation, & Ecosystem Protection: Finding the Right Balance for SF Bay. LTMS Methylmercury and Dredging Symposium January 28, 2010 Dyan Whyte, Assistant Executive Officer. Framework for addressing Mercury in SF Bay is the TMDL.

huy
Download Presentation

Dredging, Wetlands Creation, & Ecosystem Protection: Finding the Right Balance for SF Bay

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Dredging, Wetlands Creation, & Ecosystem Protection: Finding the Right Balance for SF Bay LTMS Methylmercury and Dredging Symposium January 28, 2010 Dyan Whyte, Assistant Executive Officer

  2. Framework for addressing Mercury in SF Bay is the TMDL

  3. Established Water Quality Objectives for SF Bay 0.2 ppm mercury in large predator fish 0.03 ppm mercuryin prey fish California least tern

  4. TMDL Implementation Dredging and In-Bay Disposal • Load Allocation = Zero • Implement LTMS • Restrictions on In-Bay Disposal • Sed. Hg conc. < ambient (0.53 ppm) • Operations shall not cause an increase in Hg bioavailability

  5. TMDL ImplementationWetlands Creation & Restoration • No net increase in Hg or MeHg loads • Requirements in WDRs/401 WQ Certs to manage existing wetlands and ensure newly constructed wetlands are designed to minimize MeHg production and biological uptake • Pre- and post-restoration monitoring • Adaptive Implementation

  6. Dredging + Desire for More Wetlands = Beneficial Reuse • Cover and Non-cover reuse requirements • Non-cover subject to strict controls • Min 3 feet below surface at anaerobic depths below tide line • Min 200 feet from future higher order channels

  7. Current Approach to Adaptive Management • Biosentinels • Baseline • Triggers • Evaluate management actions • Learning project by project

  8. Discussion Topics • RMP Hg strategy asks the right questions, is enough being done to answer them? • Identifying the right biosentinels & triggers is critical • How reversible do actions need to be? • Regional Monitoring Approach – Is there a need to formalize?