1 / 19

PRESENTATION BY DEPTT. OF FPI & HORTICULTURE GOVT. OF WEST BENGAL

PRESENTATION BY DEPTT. OF FPI & HORTICULTURE GOVT. OF WEST BENGAL. Crops and Districts for NHM Intervention Program (2006-07). Assistance sought for 9 Crops and 10 Districts. CROP WISE BREAKUP. West Bengal NHM Annual Action Plan-2006-07. Rs. in Lakhs. Nursery for Planting material.

Download Presentation

PRESENTATION BY DEPTT. OF FPI & HORTICULTURE GOVT. OF WEST BENGAL

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. PRESENTATION BY DEPTT. OF FPI & HORTICULTURE GOVT. OF WEST BENGAL

  2. Crops and Districts for NHM Intervention Program (2006-07) Assistance sought for 9 Crops and 10 Districts

  3. CROP WISE BREAKUP

  4. West Bengal NHM Annual Action Plan-2006-07 Rs. in Lakhs

  5. Nursery for Planting material • PUBLIC SECTOR (4 HA.): 10 • PRIVATE SECTOR (4 HA): 10 • PRIVATE SECTOR (1 HA): 240

  6. Tissue Culture

  7. Proposed Area Expansion program for Fruits Total area expansion in the 2006-07 is estimated at 8500 ha.

  8. New Gardens Floriculture

  9. Proposed Area Expansion program for Spice

  10. Plantation Crops

  11. Program for Rejuvenation

  12. Protected cultivation: Total 59.25 lakh

  13. Integrated Pest Management project

  14. HRD: Total Assistance Rs. 182.175 lakh

  15. Post Harvest Management 2006-07

  16. Mission Management

  17. Rs. in Lakhs West Bengal NHM Financial Plan for 2006-07

  18. SYNOPSIS OF FUND REQUIREMENT BACKLOG FOR 2005-06: Rs. 4415.76 FUND REQUIREMENT FOR 2006-07: Rs. 9377.00 _______________________________ TOTAL Rs. 13792.76

  19. THANK YOU

More Related