110 likes | 284 Views
Lower your Inventory Management Costs. Benefits. Save Floor Space 24/7 Part Availability Improve Inventory Accuracy and Control Improve Security of Parts Inventory. 9 Ways Costs Are Reduced. Payroll Savings Misuse Reduction due to Increased Security Better Inventory Control
E N D
Benefits • Save Floor Space • 24/7 Part Availability • Improve Inventory Accuracy and Control • Improve Security of Parts Inventory
9 Ways Costs Are Reduced • Payroll Savings • Misuse Reduction due to Increased Security • Better Inventory Control • Increased Accountability through Video Monitoring • Faster Pick Times due to Easy-to-Use Software • Integrated Supply and Consignment Inventory • Floor Space Savings • Improved Purchasing & Replenishment • Comprehensive Reporting (170+ Standard) • Better Supplier Price Negotiation • Visibility of Price Differences of Multiple Facilities • And More…
CribMaster Inventory Control Software • Automatic Replenishment • Password Protected Parts • Job Costing • Cycle Counting • Parts Locator • Transaction History / Audit Trail s Or Interface to your existing software • SAP Systems • MRO • Applied • Maximo • Datasteam • DPSI PMC2000
Before After
VerticalStorage • 32 Square Feet / Module • 10’ to 40’ Height • up to 1200 lb Capacity Shelves • up to 100” x 32” Shelves • PLC Controls High Density Storage • A Single Module can hold up to 50 sections of shelving
Each Vertical Storage Module can hold up to 50 sections of Shelving
National Bakery Case History BeforeAfter • Reduced floor Space 5,400 Sq. Ft. 400 Sq. Ft. • Reduced Cycle count time 8 hours 2 hour • Automated Crib Attendant 30 hrs./day 6 hrs./day • Improved inventory Accuracy 85% 98 (+)% • Reduced parts search time 12 minutes 1 minute • Decreased downtime of production equipment
Case History BeforeAfter Reduced floor Space 4,383 Sq. Ft. 172 Sq. Ft. Reduced Cycle count time 6 hours 1 hour Automated Crib Attendant 10 hrs./day 2 hrs./day Improved inventory Accuracy 80% 95 (+)% Reduced parts search time 15 minutes 1 minute Safer retrieval of heavy tooling Decreased downtime of production equipment