30 likes | 160 Views
Main news. DAQ test bench running in Geneva 2 LDCs connected to 2 different PCs, 1 GDCs DAQ trigger distributed using MICE Trigger receiver (V977) Particle trigger given by scintillator signal discriminated by LS 4415 and using logic unit 4516 Network test with the Nortel 5510-24T switch
E N D
Main news • DAQ test bench running in Geneva • 2 LDCs connected to 2 different PCs, 1 GDCs • DAQ trigger distributed using MICE Trigger receiver (V977) • Particle trigger given by scintillator signal discriminated by LS 4415 and using logic unit 4516 • Network test with the Nortel 5510-24T switch • Unpacking software progressing • EventDump code exists based on DATE distribution but in C++ • Decoding of TDC data is done • Shipping equipment to RAL • A first batch has been sent today 1 PC + monitor, 2 VME Crates, 1 NIM Crate, 1 Network switch ,1 VME-PCI interface and 1 Trigger receiver • The rest will be transported by car 1 PC, 1 NIM crate, VME boards, NIM boards • Shaper design reviewed and production started in Sofia • Splitter design reviewed and production started in Geneva Jean-Sébastien Graulich
First GDC has been delivered 8 hot swap 500 GB disks 2 hot swap PS 2 Ethernet cards 3 TB of space in RAID 6 SLC4 Linux and DATE installed Has to be tested for disk access time It’s also heavy and noisy…
DAQ Workshop • July 23-25 at RAL • Focus on Tracker readout control and data unpacking • There will be hands on training with DATE • How to install, configure, run, etc • Everybody is busy and has little time to write the agenda … Apologies • If interested, register to mailing list mice-dcm or visit http://indico.cern.ch/conferenceDisplay.py?confId=18417 Jean-Sébastien Graulich