Space in 361

Space in 361. The following is proposed in 361-1-012 Remove SMH and SMV[1,2,4] Install new SMV[1,2,4] Remove DIS PB[1,2,3] (4x3 racks) Install BI[1,2,3,4].BS Chicane (~5x3 racks) Alternative Install BI[1,2,3,4].BS Chicane (~5x3 racks) Install PSB Qstrip Trims (2x5 racks).

ide
Download Presentation

Space in 361

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Space in 361 • The following is proposed in 361-1-012 • Remove SMH and SMV[1,2,4] • Install new SMV[1,2,4] • Remove DIS PB[1,2,3] (4x3 racks) • Install BI[1,2,3,4].BS Chicane (~5x3 racks) • Alternative • Install BI[1,2,3,4].BS Chicane (~5x3 racks) • Install PSB Qstrip Trims (2x5 racks) Obsolete (see next slides) Space for PSB BI powering

  2. Power converters for strip foil chicane • 16 Power converters integration

  3. Space in 361 • The following proposal in 361-1-012 needs further study, but identifies space for 57 EPC racks required for H- operation • From LS1 -> H- operation • Install new SMV[1,2,4] (megadiscap)(x4 non-standard racks) • Remove DIS PB[1,2,3] (4x3 racks) • For H- operation • Remove old SMH and SMV[1,2,4] • Install BI[1,2,3,4].BSW1 (~5x3 racks) • Install BI[1,2,3,4].BSW[2,3,4] (~14x2 racks) • Install PSB Qstrip Trims (2x5 racks) Space for PSB BI powering

More Related