1 / 13

Using Demetra+ at S U RS

Using Demetra+ at S U RS. Manca Golmajer , Andrejka Smukavec 20 June 2013. Organization of SA. Time series methodologists Modelling (model selection and modification) Training (study, preparation of literature, courses) Contact: zascas.surs@gov.si Survey managers

ilario
Download Presentation

Using Demetra+ at S U RS

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Using Demetra+at SURS MancaGolmajer, Andrejka Smukavec 20June 2013

  2. Organization of SA • Time series methodologists • Modelling (model selection and modification) • Training(study, preparation of literature, courses) Contact: zascas.surs@gov.si • Survey managers • Preparation of original data • Automatic seasonal adjustment • Publishing

  3. Seasonal adjustment software and method Software: • Demetra 2.04: until 2013 • Demetra+ 1.0.4: between2013 and 2014/2015 • JDemetra+: from 2014/2015 on Method: • TRAMO/SEATS

  4. Introduction of Demetra+ Gradual introduction of Demetra+ during 2013: • New time series: Demetra+ is used • Old time series: introduction of Demetra+ is joined with annual review

  5. Associated activities • Literature: • Time series manual (for survey managers) • Time series glossary • Seasonal adjustment of time series (methodological explanations) • Commenting of seasonal adjustment of time series • Demetra+ manual (for time series methodologists) • Course for survey managers • Presentation for the Bank of Slovenia and the Institute of Macroeconomic Analysis and Development

  6. Input and output file • Input file: • Excel • One sheet • One type (monthly or quarterly time series) • Dates: first day of the period • Output file: • Excel – ByComponent • Used by most survey managers • Dates: first day of the period • Csv – VTable • Dates: last day of the period

  7. Refreshing • Transformation, calendar effects, regression effects (pre-specified outliers) andthe ARIMA model are fixed, only automatic outlier detection might be enabled for the last few periods. • The refreshing option: Partial concurrent adjustment – All outliers (+params) • Options Concurrent adjustment and Partial concurrent adjustment – Arima and outliers (+params) do the same in our case • Option Partial concurrent adjustment – Last outliers (+params) enables automatic outlier detection for the whole last year

  8. Checking the results • Seasonal adjustment of a time series is successful if: • summary is Good • all the other diagnostics (except for thenumber of outliers) are Good or Uncertain • automatic outlier detection is disabled • If seasonal adjustment of any time series is unsuccessful, the survey manager must send the multi-processing to the time series methodologist to checkandmaybechangethe model (checktheBaddiagnostics, includeanoutlier, etc.).

  9. Some positive things about Demetra+ • It is very user-friendly: • Well organized • Colours are used • Our survey managers like the Excel output • It has a lot of possibilities, tools, tests, etc. It gives the user a lot of informationandbetterunderstandingoftheseasonaladjustmentprocess. • It is much faster to select a model (transformation, calendar effects, outliers, ARIMA model) with Demetra+ than with Demetra.

  10. Some negative things about Demetra+ • We donot like the chart scale.

  11. It is difficult to compare different models for the same time series. • The maximum values for the coefficients of the ARIMA model are (3,2,3)(1,1,1). In Demetra we also used (0,1,1)(0,1,2). In Demetra+ we use (0,1,1)(1,1,1) instead.

  12. Some problemswithDemetra+ • Strangevaluesfor time seriescomponents

  13. Methodological improvements • We can send our questions to ESTAT-Methodology@ec.europa.eu. • We started using trading days effect (6 or 7 regressors). Before we used only working days effect (1 or 2 regressors).

More Related