1 / 34

GATEWAYS FACILITIES – THE “JOURNEY”

GATEWAYS FACILITIES – THE “JOURNEY”. Agenda. Facilities Presentation and Purpose Where we’ve been Progress this year A recommendation for your consideration Small Group Break Out Discussions Next Steps Note: Authorization/voting comes later. STRATEGIC PLAN – OUR FACILITIES SHOULD:.

iman
Download Presentation

GATEWAYS FACILITIES – THE “JOURNEY”

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. GATEWAYS FACILITIES – THE “JOURNEY”

  2. Agenda • Facilities Presentation and Purpose • Where we’ve been • Progress this year • A recommendation for your consideration • Small Group Break Out Discussions • Next Steps • Note: Authorization/voting comes later

  3. STRATEGIC PLAN – OUR FACILITIES SHOULD: • Support Our Mission and Vision • Enable our key ministries and our growth initiatives by providing adequate space for: • Worship • Life Span RE • Social Events ,Meetings and Functions • Administrative Offices • Be safe and accessible • Be welcoming • Be well maintained and clean

  4. Last Year, We Explored The “Three Options” • Option 1 – “Stay and renovate” • Option 2 – “Buy raw land and build from scratch” • Option 3 – “Buy an existing building and re-purpose for church use”

  5. JUNE 2012 DECISION: STAY!… but what now??!!

  6. First - The Progress This Year • Obtained a new ALTA survey for the property with elevations (topographical) • Electronic ‘CAD’ files, already in use by other professionals • Schommer Engineering selected to design parking lot and storm water management • Fania Roofing completed forensic examination of roof (more on this later) • Multiple meetings with the Board

  7. Reality Check – OMG!Our Needs Exceed Our Budget! • Likely > $4 million total! • 2 Story Chapel over “church basement” - $2 million (w/o elevators and bathrooms) • Elevators and fire isolated stairwell - $850,000 • Complete new RE Complex $1 million • Parking Lot - $830,000 • Roof and maintenance ?!

  8. Guidance from the Board: “Success would be a plan to accommodate our long term success and not just the immediately foreseeable future.” Phasing is both acceptable and necessary.

  9. Threshold Congregation Research on Facilities Priorities • Visitors can always find parking spaces • Restrooms are conveniently located and adequate for a crowd • Space for infants and young children is clean and designed to meet their needs • Ditto for youth • Comfortable accessible seating available at every Service

  10. Current Needs Assessment

  11. Proposed Phase 1 • Parking Lot • Because we have to • And it’s the right thing to do • Roof – Ditto • Remainder for discretionary spending • Let’s explore each item

  12. My Parking Lot Ministry Tanya Van Order • Current peak usage is 128 cars w/30 on the street • Only 75 spots in current lot • Neighbors and Fire Marshal object to on-street parking

  13. A Parking Lot … And So Much More Required Elements: Parking is a Regulatory Requirement! • Hard surface, curb and gutter • Landscaping plan • Lighting plan • Storm water runoff management plan • NO New Water Into Storm Sewers!

  14. My Roof Journey – Helene Ferm • Root cause of failure per forensic report • Nails too short • Wooden nailing strips failing • Brittle tiles • Poor snow/water management

  15. Roof Construction

  16. Roof Options • Conclusion – Repairing is not a long term solution • Replace w/tiles = $1M • Replace w/asphalt = ~$200-300K • Budgeting $200K for this expense • Will re explore historic preservation grant • Interim stabilization $$ may be required

  17. What else might we accomplish in Phase 1? Balancing remaining funds against our biggest needs: • Social space for public gathering • ADA Bathrooms • Do something for RE

  18. Interior View Architect’s Rendition

  19. This“Fellowship Hall” is packed with many features we need

  20. Elevation View – North & West

  21. Alternative Exterior Finish

  22. North View Architect’s Rendition

  23. South View Architect’s Rendition

  24. Courtyard View – Architect’s Rendition

  25. Smaller Items we could also consider • Refresh the Sanctuary • New softer chairs • New carpet • Sound system • Visual elements • Wired smoke detectors in all RE classrooms • Convert kitchen into new main office

  26. Some Green Opportunities • Ground Water recharge via new parking lot • A Landscape Plan • Required for parking lot • So, let’s replace some other trees! • EIFS – like a thermal blanket around a building's exterior

  27. Phase 2 – A new Sanctuary

  28. Preliminary Parking Layout – About 146 spaces in upper lots

  29. Process for Break Out Sessions • Break into groups of 6-10 • We will process 3 key questions – about 10 minutes for each • For each question, your group should develop a list of its top 3 comments • Your facilitator will record your results • Results will be “grouped” by similar content for large group discussion

  30. Ground Rules for Breakout Sessions • Stay on topic • Listen – allow people to finish • “Step forward – Step back” • Respect each other – any disagreement should be with ideas, not people • No one of us is as smart as all of us! • Everyone should feel heard and respected

  31. Next Steps • Email additional input to imagine@muuf.org • Annual Meeting – 6/2/2013 • Data summary provided at Annual Meeting • Confirm direction and pre capital campaign work • 2013 Fellowship year • Granular presentation on proposal • Vote to proceed with Capital Campaign to fund proposal • Commence parking lot construction – summer of 2014 (best case scenario)

  32. Thank You!

  33. Summary – Phase 1 • Parking Lot • Roof (exactly what depends on historical grant issues) • New Fellowship Hall • with 2 modern RE classrooms and • Plenty of ADA bathrooms • Refurbish Sanctuary • Wired smoke detectors in all RE classrooms • Convert kitchen into new main office • Landscaping and tree renewal project

More Related