An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. TRIUMF Canada’s National Laboratory for Particle and Nuclear Physics State of TRIUMF Users Meeting August 1-3, 2007

  2. TRIUMF Statistics • ~500 scientists and staff on campus • ~90 (50+40) staff MDS Nordion(45K treatments /wk) • 1000 users (large fraction non-Canadian) • 2000 visitors per year (many school kids) • Particle physics (external CERN and Japan) • Small internal program • Nuclear physics (world leading ISOL program) • Life Sciences (primarily with UBC) • Material Sciences (national & international)

  3. State of TRIUMF (PP) • High quality world class research in energy frontier particle physics • LHC accelerator program successful • ATLAS detector program successful • Tier One Center about to begin (national CFI) • Expanding ATLAS Analysis Group • Excellent neutrino program in T2K Thanks to Alan Astbury for LHC Program

  4. State of TRIUMF (NP) • World Leading ISOL facility • Medium beta SRF linear acceleration successful • High beta underway • First experiments running at ISAC-II • TIGRESS and TITAN about to commence • Major investment in state-of-art detector systems • Will strengthen technical support infrastructure • New beam development limits physics • Time to maximize the physics output • Critical for 5-yr plan: must show success in past physics goals Thanks to Alan Shotter: Very Strong ISAC Program

  5. Material Sciences • Unique facilities in muSR and beta-NMR • National CFI underway for muSR • Broad national interest • Highly productive & talented researchers Significant room for expansion of science

  6. Life Sciences • Tremendous success in brain research • Planning major national initiative

  7. People • TRIUMF is characterized by • its highly talented staff • staff committed to lab success • TRIUMF’s success relies on the innovative and hard work of its user community

  8. TRIUMF is not an acronym TRIUMF is not a motorcycle (TRIUMPH) TRIUMF is a name CERN is a name ITER is a name Please don’t say Tri-Meson Facility…..

  9. Members: Univ. of Victoria Univ. of BC Simon Fraser Univ. Univ. of Alberta Univ. of Toronto Carleton Univ. Univ. de Montreal Associate Members: Univ. of Regina Univ. of Manitoba Univ. of Guelph McMaster Univ. Queen’s Univ. St. Mary’s Univ. Owned and Operated by a Consortium of Universities

  10. Members: Univ. of Victoria Univ. of BC Simon Fraser Univ. Univ. of Alberta Univ. of Toronto Carleton Univ. Univ. de Montreal Associate Members: Univ. of Regina Univ. of Manitoba Univ. of Guelph McMaster Univ. Queen’s Univ. St. Mary’s Univ. New Dirty Mouse House planned Owned and Operated by Consortium of Universities

  11. Jean-Michel (after consultation with Tom Ruth, Head of Life Sciences) proposes new high power electron accelerator aimed in the northeast direction could solve dirty mouse problem Shane Koscielniak will pursue this idea further with help from Canadian Light Source Colleague Mark DeJong

  12. Goal of this Meeting • Kickoff for CFI & 5-year plan seasons • Written Reports for preparation of CFI proposals and 5-yr plan (1-2 pages in some cases) • Physics Group • Make physics case for e-linac • E-linac group • Start to layout design, space and cost • New Target module Design needed • Plot strategy for ILC & SPL contribution • Plot strategy for ILC & sLHC detectors • All working Groups should write short summary

  13. Near Term Future

  14. Reminder • Search for Head of Accelerator Divison • Search for Head of Engineering Division

  15. Initial Hiring Priorities • Discussed within lab extensively • Reflect priorities (top down approach) driven by physics and science priorities • Top Priorities (harvest largest investments) • LHC physics • ISAC physics • nuclear structure • nuclear astrophysics • fundamental symmetries (new)

  16. Hiring Priorities 1) Two ATLAS junior experimentalists and one “LHC” type theorist 2) Support for ISAC Program • One for target group • One for remote handling • Two operators 3) One for Safety Group (actinide targets) • Fundamental symmetries very high priority (3rd prong) • QA Efforts being focused (extremely important for CNSC license) • Low Power test done before next summer international review of 5-year plan or it won’t be in the plan-not credible • Not waiting for second beamline (task force formed) • Strategic Planning and Communications (offer made) - Combines with present strong outreach program • RF + Cryogenics (one each) (build up SRF)

  17. Hiring Priorities 6) Engineering Support • Mechanical and Electrical Engineer (T2K) 7) Nuclear Astrophysics Theorist (serial search for theorists, likely next summer) 8) Joint university positions (under review by Board of Management) Six++ positions • Fundamental symmetries • Accelerator physics • 2 life sciences (molecular biologist, chemist, physics?) • Beta-NMR (physics potential high—needs beam time) • muSR (strong national interest)

  18. Space (MOB) • Space Committee will review case for renovating space for ATLAS Western Analysis Center-2nd floor above lobby • Also renovate cafeteria—year round use • Building facade will look like ISAC-II • Expand & modernize lobby for visitors

  19. CFI & 5-Yr Plan Longer Term Future • Life Sciences • SRF

  20. 5-Yr Plan Dates • The current schedule for the 5-year plan is as follows: • Sub groups form by end September 2006 • Groups meet September 2006 to June 2007 • Town meeting August 1-3, 2007 • ACT Meeting at TRIUMF September 21, 2007 • Overview group takes subgroup input + town meeting • Draft plan by overview group November 2007 • ACOT input November 2007 • Town meeting December 2007 review draft plan • ACOT input May 2008 • Final plan ready by July 2008 • NRC Peer Review of TRIUMF 5-Year Plan September/October 2008 • Presentation to NRC Council February or June 2009

  21. Forming 5-yr Plan Committees • Progress Report Comm • (Chair: Byron Jennings) • Proposal Committee • (Chair: NSL) • Proposed external membership (not contacted yet!) Some Obvious Choices… • Dave Kulp Users Group Chair-elect • William Trischuk IPP • Garth Huber CANP • Plus Jean-Michel Poutissou and internal people Will add more external people to cover all areas

  22. Life Sciences at TRIUMF Parkinson’s Exists and expanding New Doubling of Program Cancer Imaging Pull together New National Program In Molecular Imaging focused on Neuro-degenerative Diseases and Cancer

  23. Life Science UBC/TRIUMF • Presently world class Parkinson’s Research collaboration UBC/TRIUMF • Pacific Parkinson’s Research Centre (PPRC) • Director Jon Stoessl M.D. • Approximately 3,500 clinic visits annually • 1500 people with PD seen in past 12 months • Trauma initiates Parkinson’s • Placebo effect real • Provides all isotopes & support for the PET Centre • Tom Ruth Director of PET & Life Sciences • Maintain world leading Neurodegenerative Disease Research program

  24. Funding Total: $11M Peer Reviewed Grant over 5-years This Entire Program Relies on TRIUMF

  25. New Direction for Life Sciences (BC Cancer Agency) • Cancer Imaging with PET • Francois Benard M.D. (from Sherbrooke U. 08) • New cyclotron centre at BCCA next year • Large investment by Province ($30M) • Strong collaboration TRIUMF & BCCA established • PET at BCCA has scanned 3700 adults & 300 children in last two years with TRIUMF generated isotopes • Training BCCA personnel at TRIUMF • Developing research collaboration

  26. Future of Cancer ResearchInterdisciplinary Program • M.D. identifies tumor of interest • Tumors express unique proteins • Identify the protein or DNA/RNA • Hot field is to identify correct RNA sequence (molecular biologist) • Build molecule that attaches to RNA (chemist) • Called anti-sense oligonucleotides • Presently pursued at UBC/TRIUMF for Parkinson’s • Radio-tag large molecule (chemist) • Imaging Technologies (physicist/computing expert) TRIUMF links together Researchers from Across Several Disciplines

  27. National CFI Proposal for New Electron Accelerator • Understand the Origin of the Chemical Elements—supernovae, neutron star accretions….(working group) • Expand materials research program (working group) • Expand novel medical isotope production • OECD 1997 report recommended regional centres • TRIUMF is centre for radioactive beams in North America and is the world leading for this type of research • World investment in this area in next decade ~$2B (we need to expand) • 4-year backlog of requests from International User Community • University of Victoria is lead university • UBC (physics & chemistry) SFU (physics & chemistry) • Canadian Universities and CLS involved • BC companies interested in these technologies PAVAC, DPACE, UMA • Need more

  28. Advancing Accelerator Technology • SRF is Technology of choice for New Projects: • Radioactive beam expansion  New electron accelerator • International Linear Collider (ILC) (world design underway) • SPL (MW Class 4 GeV LINAC at CERN for LHC injector, ISOL, neutrinos, neutrons… • 4th generation light source

  29. Highest ISAC Priority: New Beamline • Physics Case: Fundamental symmetries • Last 5-year plan 2nd beamline R&D only • E-linac needs a 2nd beamline • New actinide target modules need to be designed • Add mass separators and RFQ • Goal is three beams to ISAC

  30. Ultra Cold Neutrons • EDM of neutron fits very nicely with actinide physics program of fundamental symmetries • Classic difficult experiments • Search for extra dimensions fits with LHC goals

  31. Proposed Advanced Technology and Molecular Imaging Bldg Includes Tunnel for New Beam Lines

  32. Miscellaneous • New Plan for OPCOM • Will discuss replacing with scientific policy committee consisting of university members • Recommended by Task Force • Comments welcome • Awards committee (Eric Vogt Chair) • Astbury, McDonald, Taylor • Send in your suggestions • Hosting Linac08, PAC08, INPC2010 • Creating TRIUMF USERS Office

  33. Thank you for coming Have a productive Workshop Its Your Lab too!