1 / 19

Enhancing Rapid Sand Filtration by Backwashing with Alum

Enhancing Rapid Sand Filtration by Backwashing with Alum. Turbid Water. Alum. Rapid Sand Filtration. Rapid Sand Filtration: Filtration of water by passing it through a fine grained media to remove very small suspended particles

Download Presentation

Enhancing Rapid Sand Filtration by Backwashing with Alum

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Enhancing Rapid Sand Filtration by Backwashing with Alum Turbid Water Alum

  2. Rapid Sand Filtration • Rapid Sand Filtration: • Filtration of water by passing it through a fine grained media to remove very small suspended particles • Usually used after flocculation and sedimentation in water treatment plants for polishing • Requires backwashing to clean filter

  3. Quantifying Filter Performance • Filter Removal Efficiency • Particle Breakthrough • Ripening Time– the time it takes for a filter to achieve the desired effluent turbidity • Minimum Turbidity Achieved

  4. How to Improve Filter Efficiency? ALUM Al2(SO4)3*14.3H2O • Alum decreases repellant inter-particles forces • Commonly used in coagulation in WTP’s • If alum is in a filter it should mediate particle-media attachement Picture from: www.foodsubs.com/Misc.html

  5. Our Approach • Add alum in a backwash state • Mixing should evenly coat the media throughout the filter Avoid creating a cap of flocculated particles on top of the filter column that creates high head loss Flocculated “Cap” Alum

  6. Objectives • To create a method to add alum to a filter in backwash mode • To characterize the effects of varying the alum dose on the filter’s turbidity removal. efficiency and ripening time

  7. Backwash effluent (to waste) - Solenoid valves Physical Apparatus Concentrated clay suspension (~ 4 g/L) 4 Stir plate Peristaltic Pump 1 Sand filter column Effluent (to waste) Flow Accumulator Turbidimeter Overhead water influent 1 2 20 g/L alum stock Head loss device and 7 kPa pressure sensor 3 Manual needle valve Pressure regulating valve Peristaltic Pump 2

  8. Process Control • 5 states used in experimentation: • Backwash • Backwash With Alum • Settle After Backwash • Filter • Settle After Filter

  9. Experimentation • Tested five different initial alum doses to the filter and one control filter • Control, 25, 50, 100, 200, and 590 mg/L • 4 hour filter runs (extended from 2 hour runs) • Alum dose changed by increasing/decreasing peristaltic pump speed • Calibrated the influent turbidity before each experiment to 25 NTU by manually adjusting the turbidity pump speed

  10. Results: Overall Filter Performance • Increased overall removal efficiency • Positive correlation between increased alum dose and increased particle removal Filter performance for 590 mg/L and 50 mg/L alum dosage (4 hrs run)

  11. Results:Particle Breakthroughs • Reduction in magnitude of particle breakthroughs • Elimination of breakthroughs during approx. first hour of filtration. • Reduced particle breakthroughs at high alum doses (590 mg/L) 100 mg/L Control

  12. Results:Ripening Time • Ripening Time estimated from effluent turbidity graphs • Virtually no ripening time with alum added Control ripening time ~ 1200 seconds 25 mg/L alum ripening time ~300 seconds

  13. Results:Ripening Time • Ripening time did not improve with increasing alum dose Summary of observed ripening times for all 4 hour runs.

  14. Results:Ripening Time • Minimum achieved turbidity did not correlate with alum dose either Summary of observed minimum turbidities for all 4 hour runs.

  15. Capacity Analogy • The results show that alum dose to the filter can be thought of as a “capacity” for particle removal • Improved overall efficiency for 4 hour run • No correlation between alum dose and ripening time or minimum turbidity • Filling two glasses analogy . . .

  16. Difficulties • Assumption that filter influent was consistently 25 NTU • Stamp box response to state changes (hence the settling states in Process Controller) YAAGH!!!!

  17. Future Research • Use of two turbidimeters – one above and one below the filter – to make constant NTU assumption moot • Measure head loss through pre-coated filter • Longer filter runs • Vary influent turbidity and alum dosage

  18. Summary & Conclusions • Unique method of alum addition to a rapid sand filter • Substantial impact on filter performance under low turbidity conditions: • Improved overall performance with alum addition • Reduced particle breakthrough • Virtual elimination of the ripening time • No correlation between increased alum dose and shortened ripening time or minimum turbidity

  19. Questions? Turbid Water Alum

More Related