TEN-155: Current core topology. SE. UK. UK1. NL. LU. BE. E3. B-WIN. DE. FR. DE1. AT. CH. POS. ATM. IT. Migration of circuits to new PoPs. IUCC, Heanet, Infonet, NACSIS, Canet, POS DFN (G-WIN), Cesnet, Poznan, NYC(UK), NYC(DE), Belnet, Janet, RCCN DFN ATM(B-WIN) DE-SE, DE-IT
E N D
TEN-155: Current core topology SE UK UK1 NL LU BE E3 B-WIN DE FR DE1 AT CH POS ATM IT
Migration of circuits to new PoPs • IUCC, Heanet, Infonet, NACSIS, Canet, POS DFN (G-WIN), Cesnet, Poznan, NYC(UK), NYC(DE), Belnet, Janet, RCCN • DFN ATM(B-WIN) • DE-SE, DE-IT • DE-CH
Circuit upgrades • STM-1 London-Athens operational • STM-1 Paris-Madrid 22/12. Interim solution based on additional E3 + T3 from Paris to Madrid which is now operational • New 34M line for Croatia expected this week • 2xSTM-1 DE-SE expected mid-December
Access circuits • 622Mbps access for Surfnet operational • 622Mbps access for DFN pending • 200Mbps access for Nordunet operational • Heanet upgrade to 34Mbps planned on 22/11 • Hungarnet access upgrade to 155Mbps on 1/12 • Pol-34 access to 155Mbps on 1/11
Interconnections • Infonet upgrade from 210Mbps to 260Mbps • Canarie upgrade from 10Mbps to 15Mbps • Abilene upgrade from 100Mbps to 255Mbps (100+155) planned for 21/11
Expectations from TF-NGN n.1 • Discussion of work-items developed in the last 2 months, identified in Vienna • For each work-item: • activity leader • participants • work-plan + timelines • resources (network, equipment, people) • discussion of co-ordinated equipment loan