1 / 6

TEN-155: Current core topology

TEN-155: Current core topology. SE. UK. UK1. NL. LU. BE. E3. B-WIN. DE. FR. DE1. AT. CH. POS. ATM. IT. Migration of circuits to new PoPs. IUCC, Heanet, Infonet, NACSIS, Canet, POS DFN (G-WIN), Cesnet, Poznan, NYC(UK), NYC(DE), Belnet, Janet, RCCN DFN ATM(B-WIN) DE-SE, DE-IT

infinity
Download Presentation

TEN-155: Current core topology

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. TEN-155: Current core topology SE UK UK1 NL LU BE E3 B-WIN DE FR DE1 AT CH POS ATM IT

  2. Migration of circuits to new PoPs • IUCC, Heanet, Infonet, NACSIS, Canet, POS DFN (G-WIN), Cesnet, Poznan, NYC(UK), NYC(DE), Belnet, Janet, RCCN • DFN ATM(B-WIN) • DE-SE, DE-IT • DE-CH

  3. Circuit upgrades • STM-1 London-Athens operational • STM-1 Paris-Madrid 22/12. Interim solution based on additional E3 + T3 from Paris to Madrid which is now operational • New 34M line for Croatia expected this week • 2xSTM-1 DE-SE expected mid-December

  4. Access circuits • 622Mbps access for Surfnet operational • 622Mbps access for DFN pending • 200Mbps access for Nordunet operational • Heanet upgrade to 34Mbps planned on 22/11 • Hungarnet access upgrade to 155Mbps on 1/12 • Pol-34 access to 155Mbps on 1/11

  5. Interconnections • Infonet upgrade from 210Mbps to 260Mbps • Canarie upgrade from 10Mbps to 15Mbps • Abilene upgrade from 100Mbps to 255Mbps (100+155) planned for 21/11

  6. Expectations from TF-NGN n.1 • Discussion of work-items developed in the last 2 months, identified in Vienna • For each work-item: • activity leader • participants • work-plan + timelines • resources (network, equipment, people) • discussion of co-ordinated equipment loan

More Related