-9 AFT Recovery. Layouts (13) Final Due by EOY – X Total X are supported by current staffing X resource help needed for systems/ducting Approved Due by EOY – X Total X are supported by current staffing X resource help needed for doors X held for Engineering. -9 AFT Recovery.
E N D
-9 AFT Recovery • Layouts (13) • Final Due by EOY – X Total • X are supported by current staffing • Xresource help needed for systems/ducting • Approved Due by EOY – X Total • X are supported by current staffing • X resource help needed for doors • X held for Engineering
-9 AFT Recovery • ME Review/Signoffs (109) • Structures • 0 are due by EOY • X are complete and need to updated in Everett tracking log • X will close with current staffing • X have been reviewed and waiting on pickup feedback from DE • X have/will missed red line date • X resource help needed
SOW for Immediate Help Needed Need 2 MEs familiar with door surrounds to assist with these layouts and ME Review/Signoffs
SOW for Immediate Help Needed, cont’d Need 1 ME (familiar with frame installation preferred) to assist with these OPF ME Review/Signoffs until LCPT can get mobilized to take on this work.
Immediate Help Needed • Need total of x immediately to support current release schedule • x to support door surrounds (Andrew Wildrick) • x to support OPFs (Ed Pylant, Abe Ortiz)