1 / 3

Connecting Europe Facility – Energy infrastructure

Proposal for a Regulation on "Guidelines for trans-European energy infrastructure". Connecting Europe Facility – Energy infrastructure. E fficient and well integrated infrastructure. Efficient and well-functioning market. Latvia submitted following projects for the PCI list:

ingrid-pate
Download Presentation

Connecting Europe Facility – Energy infrastructure

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Proposal for a Regulation on "Guidelines for trans-European energy infrastructure" Connecting Europe Facility – Energy infrastructure Efficient and well integrated infrastructure Efficient and well-functioning market Latvia submitted following projects for the PCI list: • 3rd stage of “Kurzeme ring” (electricity) • Latvian-Estonian 3rd interconnection (electricity) • Reconstruction and modernization of Inčukalns UGS (underground gas storage) • Construction of regional LNG terminal

  2. Energy infrastructure -Gas Reconstruction and modernization of Inčukalns UGS • Modernization 191 M EUR, expansion 360 M EUR • Objectives: To increase security of supply in the Baltic Sea region; After completion of interconnections between PL-LT and EE-FI, diversification of supply rotes and counterparts. Construction of regional LNG terminal • Currently under discussion on regional level • Objectives: To increase security of supply in the Baltic Sea region, to eliminate dependency from one single supplier and diversify sources.

  3. Energy infrastructure -Gas Reconstruction and modernization of Inčukalns UGS • Modernization 191 M EUR, expansion 360 M EUR • Objectives: To increase security of supply in the Baltic Sea region; After completion of interconnections between PL-LT and EE-FI, diversification of supply rotes and counterparts. Construction of regional LNG terminal • Currently under discussion on regional level • Objectives: To increase security of supply in the Baltic Sea region, to eliminate dependency from one single supplier and diversify sources.

More Related