1 / 19

Links & Clock distribution: toward the TDR

This overview discusses the crucial aspects of links and clock distribution aiming at the Technical Design Report (TDR). Explore the trends, challenges, and solutions in implementing high-speed serial links, particularly using FPGA. Learn about FPGA testing, fault analysis, and upcoming developments in clock distribution technology.

inorton
Download Presentation

Links & Clock distribution: toward the TDR

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Links & Clock distribution: toward the TDR A. Aloisio, R. Giordano aloisio@na.infn.it, rgiordano@na.infn.it University of Naples ‘Federico II’ and INFN ETD Meeting - CERN - Nov. 17th, 2011

  2. Overview • Toward the TDR • Does a Golden Solution exist ? • What if ... • Making the system working • Manpower • Discussion ETD Meeting - CERN - Nov. 17th, 2011 2

  3. Toward the TDR • Setting the scene of links and clock distributionin the ETD • Many key design elements are still missing (rad dose, partitioning, technology) • Devices non yet available today will be obsolete in a few years from now • Trends, way-of-designing, paradigms survive better, can contribute indeed to the TDR ETD Meeting - CERN - Nov. 17th, 2011

  4. Links & Clocks: taking the golden section • In our view, high speed serial links should be the golden solution to distribute ALSO the clock • In our view, their implementation should rely on FPGA as much as possible IDEA DESIGN ETD Meeting - CERN - Nov. 17th, 2011

  5. FPGA pros and cons • Pros: • Uncountable... • Cons • just one: Rad-tolerance • Rationale • A) test on beam the newest FPGAs • B) keep an eye on the silicon vendors • C) Check what ‘competitors’ do • D) Have ready a benckmark design • E) Keep simulating the background ETD Meeting - CERN - Nov. 17th, 2011

  6. Testing FPGA ‘a-la-carte’ • First test on Xilinx V5 – Jul. 10 • Tested TMR vs. noTMR moderation • Config. Memory cross-section • System cross-section of a real design • Power issue: negligible • TID effects: negligible • Latch-up: None • SEFI: minor effects • VERY detailed fault analysis presently being conducted (see next slide) • Three more testbeams coming: • Dec. 10 (V5-V6) then Mar 2012 (V6), Jul 2012 (V6-V7) • No more beam will be available after that ETD Meeting - CERN - Nov. 17th, 2011

  7. CLB 1 CLB 2 CLB 3 CLB 4 CLB 5 CLB 6 CLB 7 CLB 8 CLB 9 Fault Analysis (from last TB) OPEN PIP: net "GLOBAL_LOGIC0_451" gnd, outpin "XDL_DUMMY_INT_X2Y49_TIEOFF_X2Y49" HARD0 , inpin "data_out(13)_dup_117" DX , inpin "data_out(13)_dup_117" SR , pip CLBLL_X2Y49 SITE_BYP_B6 -> M_DX , pip CLBLL_X2Y49 SITE_CTRL_B3 -> M_SR , pip INT_X2Y49 BYP6 -> BYP_B6 , <<<<<<< pip INT_X2Y49 CTRL3 -> CTRL_B3 , pip INT_X2Y49 FAN5 -> FAN_BOUNCE5 , pip INT_X2Y49 FAN6 -> FAN_BOUNCE6 , pip INT_X2Y49 FAN_BOUNCE5 -> BYP6 , pip INT_X2Y49 FAN_BOUNCE6 -> CTRL3 , pip INT_X2Y49 GND_WIRE -> FAN5 , pip INT_X2Y49 GND_WIRE -> FAN6 , ; • We know exactly where we failed • Routing seems to be the problem most of the time: we can moderate such issues • Analysis is performed by Prof. Violante & Prof. Sterpone (Politecnico Torino, Italy) ETD Meeting - CERN - Nov. 17th, 2011

  8. From the vendor: V6 vs.V5 ETD Meeting - CERN - Nov. 17th, 2011

  9. From the vendor: V7 • Starting with V7, it should/could be possibile to correct-on-the-fly a single SEU. Waiting for more info from Xilinx about that... • Trend is clear: SEU will be handled in the future more and more carefully by specific on-chip logic ETD Meeting - CERN - Nov. 17th, 2011

  10. What BELLEII is doing ? • Help yourself ... ETD Meeting - CERN - Nov. 17th, 2011

  11. Benchmark design • We have it • Fixed latency • Low phase noise on recovered clock • Tested, presented many times, published ETD Meeting - CERN - Nov. 17th, 2011

  12. Background simulation • Vital • Protons? Neutrons? E spectra? • More info needed to drive the tests ETD Meeting - CERN - Nov. 17th, 2011

  13. What if ... • ... FPGAs do not fulfill our expectations on-detector • Keep sending both clock and data • Use COTS SerDes (like National, GOL for read-out only, ...) • Design a Rad-Hard SerDes (see next slide) • If (really) unfeasible, then: • Send clock via specific fibers (see later) • Design low speed SerDes (500Mbit/s) with ACTEL-like devices ETD Meeting - CERN - Nov. 17th, 2011

  14. Designing our own SerDes • We are in touch with IMEC (B) to explore the feasibility of a custom made SerDes tailored to our needs • Nov.22 we will talk to R&D Managers from IMEC for details • About costs: 500k€, about time: 1 year • Too expensive? Not really... EU programs, ESA interested, ETD Meeting - CERN - Nov. 17th, 2011

  15. Sending the clock • We do not like that... • ... but we know how to do it and we have already did a few tests (just in case ...) Jitt = 25 ps RMS Jitt = 9 ps RMS Clock driven by off–dector FPGA, to be send across fiber - 40MHz CERN TTC – 40MHz ETD Meeting - CERN - Nov. 17th, 2011

  16. Making the system working • TDR should define also important guidelines: • In our opinion, ALL links (FCTS, Read-out) should be easy upgradable, BOTH ends (TX,RX) • Then, they should be always hosted on mezzanine cards, BOTH ends (TX,RX) ETD Meeting - CERN - Nov. 17th, 2011

  17. Links should talk each other • Like the ride from Eden to Babel ? • In our view, one team does one link front-to-back, see ‘Facts and Opinions ...’ presentation at Elba • Crucial issue, to be discussed in the view of TDR Tower of Babel - Bruegel The Garden of Eden - Bosch ETD Meeting - CERN - Nov. 17th, 2011

  18. Manpower ? ? ? ? ? ? ? ? ? ? ? ? ? ? ? ? ? ? ? ? ETD Meeting - CERN - Nov. 17th, 2011

  19. Discussion …. • …. Is now open …. ETD Meeting - CERN - Nov. 17th, 2011

More Related