Case Study Case Study Ground Water Remediation Solution Remediation Solution Ground Water
The client had an extensive problem with ground water at a site on the East Coast of Australia at risk of contaminating a main river system within 100 yards from the site.
The mobile recycling unit was dispatched to site and setup and operational within 3 hours of delivery.
The contaminated groundwater consisted of sand and clay mix.
The volumes processed each 10 hour day was 70,000Litres and ran for 40 days.