An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. What you get ?Transverse and Longitudinal distributions F.Roncarolo, W.Andreazza, S.Bart-Pedersen, A.Boccardi, E.Bravin, B.Dehning, J.Emery, J-J. Gras, A.Guerrero, M.Kuhn, T.Lefevre, A.Nosych, M.Sapinski, G.Schneider, G.Trad, R.Veness, M.Wendt Many thanks to: R.Jones, L.Jensen OP teams (V.Kein, ….) A.Bertarelli, M.Garlasche & MME team F.Caspers, E.Metral, B.Salvant G.Lanza, G.Bregliozzi and Vacuum Team(s) Many others …. Evian Workshop 2012

  2. Scope / Contents SCOPE Focus on what did not work, what is missing, current limitations during the 2012 run.Present the changes to be made during LS1 and expected performance post LS1. CONTENTS • Wire scanners (WS) • Beam Gas Ionization monitor (BGI) • Synchrotron light detector (BSRT) • Abort Gap Monitor (AGM or BSRA) • Longitudinal Density Monitor (LDM) Will not cover: Matching monitor, proposal for a new VELO-Like detector, WCM F.Roncarolo - Evian Workshop

  3. Wire Scanners – 2012 issues • Vacuum leaks • Bellow designed for ~ 10’000 scans, in 2012 1 system failed at ~10200 scans • Wire breaking • No evidence of breaking due to beam during normal operation (RF or direct energy deposition). Evidence of ageing due to sublimation. • Wire damage can be traced back to power supply failure followed by server crash that left the wire in between IN and OUT position • Overall accuracy dependence on working point • PM voltage + filter settings on same beam give different beam sizes • Many studies in 2012 (see M.Khun’s talk) • SW, OP GUI • Judged as inefficient by OP (bunch selection, automatic scans, display) • Dumps due to BLM thresholds • Secondary shower amplitude depends on actual wire diameter, that changes with ageing (see next slide) F.Roncarolo - Evian Workshop

  4. Wire Scanners – Dumps due to losses • Aged wire partially sublimated smaller diameter  lower losses new wire aged wire 34 um 16 um F.Roncarolo - Evian Workshop

  5. From beam profile to emittance Beta from beta beating • WS measurements during a test fill, with a high emittance and a low emittance bunch • Beta values during the ramp from linear interpolation 450GeV – 4 TeV Beta from model Beta from K mod F.Roncarolo - Evian Workshop M.Khun G.Trad

  6. WS - Upgrades • TS#4 • Install 7 um wire on 1 system • tests before the end of the run for assessing robustness and signal/losses • Thinner wire more robust according to literature, but less material to sublimate before breaking • LS#1 • Possibly thinner wires on all systems • Slightly higher speed (~10% max) • New bellows (aim at gaining a factor 5 in lifetime) • Improve OP GUI (OP+BI) • More system redundancy (big investment, under discussion) • LS#2 (?) • New fast (20 m/s) devices, following SPS prototype after LS#1 • Possibly new detectors (e.g. diamonds) to replace scintillator + PM F.Roncarolo - Evian Workshop

  7. BGI – 2012 issues • Both beam 1 BGIs had MCP failures in early 2012 (MCPs were exchanged during winter TS). • Reasons of the failures are understood (Operational/Technical failure) • Protection measures in place (e.g. automatic HV shutdown). • Problem with remote camera gain control, important to provide repeatable beam size measurement. • Camera failures • intensifier reaching Mean Time To Failure • Difficult cross-calibration • no intensity overlap WS/BGI during p-p runs, BSRT B2 problem • Overall results interpretation still difficult F.Roncarolo - Evian Workshop

  8. BGI – Results example • WS vs BGI during p-Pb MD (R. Versteegen, see CERN-ATS-2012-094 MD) • 13 Pb bunches, 7e9 charges/bunch • could find good calibration w.r.t. to WS despite low BGI signal • During p-p runs: • Calibration more difficult • Some evidence of dependence on bunch length F.Roncarolo - Evian Workshop

  9. BGI - Upgrades • Will dismantle and re-surface the vacuum sealing surfaces to avoid leaks (some troubles in 2012 to have them leak-tight) • MCP refurbishment • Optical system upgrade • To cope with high brightness beams at 7 TeV • HV system upgrade • To ensure a more stable operation • Camera refurbishment • Low level SW re-design from scratch • What is the allowable gas budget during a year? Can we run continuously with gas injection? F.Roncarolo - Evian Workshop

  10. BSRT - Introduction Gated camera (BSRTS) Optical delay line Proton/Ion beam DC Camera 60 % 40 % Abort Gap Monitor (AGM) 10 % Neutral filters Color filters 90 % F.Roncarolo - Evian Workshop Long. Density Monitor (LDM) 60 % 40 %

  11. BSRT – 2012 Issues • Heating with high intensity beam • Mirror coating and mirror support failures • Absolute and relative calibration (even more difficult in 2012 , affected by heating) • Software • Fast scan on demand (expert GUI) working from early 2012 • Fast scan server (communicating with OP-GUI - V.Kain) tests started in October, to be validated during p-Pb run • Overall reliability – robustness affected by • Extraction mirror heating / failures • FESA server automatisms failures • Steering following heating and energy ramp • Camera gain adjustment following injections and energy ramp F.Roncarolo - Evian Workshop

  12. BSRT – Calibration Example • B1 with new optical line (focusing lenses instead of mirrors), 450 GeV during MD period • Excellent agreement BSRT – WS over a wide emittance range, after applying • Magnification within 10% w.r.t. nominal • PSF ~20% smaller than typical values with old optics B1 Vertical Scraping Similar examples exist at 4 TeV F.Roncarolo - Evian Workshop 1 mm 1.3 mm 0.8 mm

  13. BSRT – Heating – Findings after B2 mirror removal Mirror clamps deformed Mirror coating blistered • Later Removal of B1 mirror evidenced similar effects • Both mirrors were: silicon bulk + dielectric coating • TS#3: replaced both mirrors • B1: glass bulk + metallic coating – OK only at low beam intensities • B2: silicon bulk + polishing (no coating) – not usable for imaging F.Roncarolo - Evian Workshop

  14. BSRT – RF simulations From January: RF laboratory measurements on spare tank E-field of a dominant resonating mode at 650 MHz. (Q = 1263 / Rsh = 25841 Ohm) LHC bunch power spectrum F = 650 MHz P_loss = 10-50W Mirror front Credits: T.Mastoridis, P.Baudrenghien/CERN F.Roncarolo - Evian Workshop Mirror Back B-filed of the beam in Time Domain. Red = Hot (bigger current density) Blue = Cold Measured LHC bunch power spectrum. A 650 MHz resonance is very dangerous. Longit. wake impedance of BSRT with and without Ferrite damping

  15. BSRT – Upgrades TS#4 – Intervention on B2 only • Change mirror: dielectric bulk no coating  glass bulk + dielectric coating • 6 temperature probes in vacuum, to validate RF – Thermomechanical simulations BASELINE for after LS#1 • New optics • New light parasitic shielding • Extraction mirrors: likely glass bulk + dielectric coating • Need high intensity test to validate itbefore end of this run ! • Modified tank minimizing RF coupling • Operational fast scan server Studies during LS#1 • Expected performances (resolution/accuracy) at 6.5-7 TeV • Monitor lower wavelengths to reduce diffraction ? • Novel tank design, much less sensitive to RF coupling / heating • Reflective tapered pipe with view-port on the side instead of on the bottom? F.Roncarolo - Evian Workshop

  16. Abort Gap Monitor • The weakest point remains the steering of the BSRT: “no spot no AG monitor” • A signal presence check could be implemented in the sequencer, but this doesn’t eliminate the need to verify that the telescope is not completely out of steering • BI is preparing a list of self checks to be implemented if possible during LS1, but at the cost of dead times in the measure (less than 1% of availability loss) • Calibration was kept reasonably well updated • Re-calibration each time optical path changed (e.g. due to heating) • The new BSRT optics • Doesn’t use additional delay line to pass from Undulator to D3 imaging • eliminates the need to compensate for light loss at the moment of the delay line insertion F.Roncarolo - Evian Workshop After many discussions, we got in the end a rather reliable system – when the BSRT is ‘working’. J. Wenninger – BI Day Dec.2012

  17. Longitudinal Density Monitor (LDM) • The LDM remains an expert tool • The SW is still under development • Artefacts linked to the detector behaviour still need an expert to correct for in normal fills (no impact during VdM scans) • dead time and afterpulse seems to change with filling pattern, to be checked after LS1 • Some reflections can affect the measure and need to be recognized to avoid misinterpretation: particular care was placed in the new optic setup to solve this for B1 • It can measure satellites and ghosts up to 10^-4 but is not good to verify bunch shape at a fine level With 25 ns beams we have to go back to main-main collisions, the interest will then shift back to satellites at injection and luminosity calibration runs. F.Roncarolo - Evian Workshop J. Wenninger – BI Day Dec.2012 Noted …

  18. From 4 to 7 TeV • Smaller Beam Sizes • WS: less points per sigma, could need to apply multiple-scan or multiple bunches overlaps to increase resolution (as done @ SPS Flat Top) • BGI, BSRT: will adapt optical imaging to have ~mm/pix as @ 4 TeV • BSRT: higher contribution from diffraction • Can correct for it, after quantifying it precisely • Can think about going to lower wavelength detectors • Lower BLM thresholds • Limits WS scans to ~ 1e12 • AGM, LDM • More photons, will adjust optical filters if needed F.Roncarolo - Evian Workshop

  19. From 50 to 25 ns • WS cross-talk on electronics • ~ 10 % between 25ns slots (under study) • With a reduced wire diameter, can we scan 288b at injection? • BGI: • no evident impact • BSRT: 25ns would • Increase the time to loop over all bunches (currently ~7min for 1380 bunches) • AGM, LDM: • No evident impact F.Roncarolo - Evian Workshop

  20. Conclusions - Overview Transverse and longitudinal diagnostics allowed optimizing and safely running the LHC (WS as references, BSRT bunch-per-bunch, AGM) • need development for improving the overall performance and reliability after LS#1 • For each device we have a list of issues to study, improve, develop for 7 TeV and 25 ns • Fundamental checks before LS1 • BSRT heating • WS thresholds • SW/Control • We need to profit of LS1 for reviewing all instruments low and high level SW individually • Transverse Profile Workshop, CERN, April2013 • Experts from GSI, DESY, FermiLabetc … presenting experience with BGI, Sync. Light etc … Transverse Need high intensity run in Jan-Feb 2013 !! • Longitudinal • AGM reliability depends on BSRT optical line robustness. MP workshop will trigger again interlocking? • LDM needs some work to make it operational, efforts in LS#1, but will re-start likely as expert tool (need for development and relative resources) F.Roncarolo - Evian Workshop

  21. SPARES F.Roncarolo - Evian Workshop

  22. BSRT – Optical Line Old Optics Entrance (steering) mirror New Optics F.Roncarolo - Evian Workshop

  23. Wire Scanners – Present Performances • Integration • 40 MHz sampling of PM integrator allows bunch per bunch measurements • 50 ns ok • 25 ns cross-talk being studied • Repetition Rate • Ideally ~0.2 Hz, at cost of system lifetime (wire, bellows) • Dynamic range • From pilot bunch to ultimate intensity per bunch, but: • Limits on total beam intensity • Future: faster WS (20 m/s?) • can allow higher intensities at the cost of • multi-scans on a single bunch (go faster  few points/sigma)  need to overlap multi-scans with sampling position offsets • single scan, combine NN bunches to have enough points/sigma F.Roncarolo - Evian Workshop

  24. WS - Accuracy • Resolution • limited by minimum wire speed vs protons revolution frequency • 1 m/s  89 um between two consecutive wire position acq. ( profile points) • Can be improved overlapping multi-scans (or single scan combining NN bunches) with sampling position offset (as being tested now @ SPS) • Present wire position resolution limited by potentiometer noise (some 20um) • New WS: aiming for 2um resolution (independent of speed) • Accuracy • With proper PM and filter settings, absolute accuracy proved to be 1% for the SPS linear WS • Accuracy of LHC WS under study • theoretically equal to SPS linear WS • At the moment: evidence of dependence on working point (PM gain + filter settings SLIDE/PLOT ON THIS?) • Plan for different secondary shower detector (diamond), related to SPS prototype to be tested after LS1 • Improve dynamic range • Get rid of filters  avoid dependence on working point • PHD on electronics F.Roncarolo - Evian Workshop

  25. BGI – Operational Specs • Gating/Integration • Gated camera • Need to gate over multi-bunches to have enough signal (see dynamic range) • Repetition Rate • 50Hz, limited by image digitalization (BTV) • Dynamic range • With a “fresh” MCP: • 10 proton bunches with gas injection 10-8mbar • Single Pb ion bunch with gas injection 10-8mbar • A bit better at 4TeV due to denser beam • MCP aging rather quick F.Roncarolo - Evian Workshop

  26. BGI – Results Example II Typical p-p high intensity fill • emittance “decrease” at the beginning of the ramp (related to bunch length?) • variations of calibration parameters from fill to fill • emittance “decrease” right after the ramp… • signal amplitude decrease during the fill (more then expected from intensity) Bunch length from 1.4 to 1 ns ns (NO RAMP) F.Roncarolo - Evian Workshop Measurement at injection, investigating bunch length influence on beam size seen by BGI.

  27. BGI - Performances • Resolution • Present optics gives 0.115 mm/pixel • Accuracy • Optics magnification validated to 1% by • Beam orbit local bumps • Reference wire-grid calibration • Needs cross calibration w.r.t WS and BSRT • For the moment not better than 20%, degrading with MCP aging • Many studies on going to understand ultimate resolution/accuracy • LS1: • Replace MCPs • Second camera with better performances F.Roncarolo - Evian Workshop

  28. BSRT Operational Specs • Gating • Intensified camera gating down to 25ns with a 12.5ns gating resolution • Repetition rate • Max 200 Hz (limited by intensifier trigger rate) • Present image digitalization (BTV) 50 Hz • Present control + acquisition SW ~12 Hz • Can do bunch per bunch @ ~12Hz • Can do single bunch single turn but not on consecutive turns • Dynamic Range • Protons: From pilot at injection (single turn, every 220 turns) to average over all bunches at flat top • Ions: From ~30 bunches at injection to average over all bunches at flat top F.Roncarolo - Evian Workshop

  29. BSRT – Heating vs bunch length Clear evidence that heating is due to RF coupling with high intensity beams Temperature gradient changes at each bunch length step F.Roncarolo - Evian Workshop

  30. BSRT - Performances • Resolution • Present optics 0.1 mm/pix, next: 0.05 mm/pix • Relative bunch per bunch accuracy <= 5% • 5% on single shot, dominated by reproducibility affected by noise (airflow, optical elements vibration, fit accuracy, etc …) • 1% averaging on multi-shots • Absolute accuracy: • Optics magnification validated to <= 5% • Calibration target • Beam orbit local bumps • Ultimate accuracy dominated by aberration / diffraction • Need cross calibration w.r.t. WS •  calibration factors  accuracy <=10% after calibration • Calibration factors not stable • Possible drifts due to mirror coating aging (heating) F.Roncarolo - Evian Workshop

  31. F.Roncarolo - Evian Workshop

  32. F.Roncarolo - Evian Workshop

  33. BSRT - Heating • B2 Temperatures end of August Last two fills before putting mirror to OUT position and then removing it. + UFO activity …. F.Roncarolo - Evian Workshop

  34. BSRT – Heating – B2 Mirror 28-Aug-2012 1- Beam (spot not in the ‘right’ place vertically) Access to remove mirror 2- Beam dump 4-No beam, no motors movement, mirror moved 3- Close Vacuum sector and retract mirror to OUT F.Roncarolo - Evian Workshop

  35. BGI - Introduction • Collect electrons from beam-gas ionization • Dipole B field to avoid drift from ionization location to MCP • MCP electron multiplication • Phosphor coupled to MCP output for electronphoton conversion • Imaging of phosphor output • Designed for heavy ions • Enough signal from protons by injecting local pressure bumps or high intensity • Can monitor average relative beam size variation during the ramp F.Roncarolo - Evian Workshop M.Patecki, M.Sapinski

  36. Wire Scanners - Introduction • Reference device for transverse profile measurements • 1 H + 1 V per beam (+ a spare for each) • 30 um Carbon wire flying at 1 m/s • Scan on-demand • Dynamic range controlled by PM gain and optical filters • Can be used up to a maximum intensity that depends on beam energy • Above such maximum intensity: wire damage and/or quench downstream magnets ( BLM thresholds to dump before reaching quench limit) F.Roncarolo - Evian Workshop

  37. BSRT (and BGI) - Calibration • sm [pixels] = Measured Sigma • M [mm/pixels] = System magnification (optical line + pixel size) • determined by optical line adjustment with energy (UND  D3) • reference target vs closed orbit bumps give up to 10% differences • spsf [pixels] = measurement error due to • aberration, diffraction • extraction mirror aging/deformation During 2012 heavily affected by extraction mirror heating (deformation + coating damages) Difficult to find a stable calibration w.r.t. WS F.Roncarolo - Evian Workshop

  38. Longitudinal Density Monitor (LDM) - Upgrades • After LS1: • new BSRT optics, new light shielding  less parasitic reflections • new detectors under investigation (e.g. fast PM) B1: new optics Reflection on BSRT filter wheel, at a possible satellite location B2: old optics Satellites 5ns from SPS Different colors = different bunches After L 5 ns With 25 ns beams we have to go back to main-main collisions, the interest will then shift back to satellites at injection and luminosity calibration runs. F.Roncarolo - Evian Workshop J. Wenninger – BI Day Dec.2012 Noted …