1 / 16

Transit Choices – An International Overview

Transit Choices – An International Overview. Alan Howes Alan Howes Associates. Overview. BRT and Busways worldwide Types of BRT Key Features Choice in Action – a Personal View. 150+ “BRT” Systems Worldwide. 30m+ “BRT” Passengers per Day. Big range in “Busy- ness ”.

ira-levy
Download Presentation

Transit Choices – An International Overview

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Transit Choices – An International Overview Alan Howes Alan Howes Associates

  2. Overview • BRT and Busways worldwide • Types of BRT • Key Features • Choice in Action – a Personal View Alan Howes Associates

  3. 150+ “BRT” Systems Worldwide Alan Howes Associates

  4. 30m+ “BRT” Passengers per Day Alan Howes Associates

  5. Big range in “Busy-ness” Alan Howes Associates

  6. Differing Types of System Alan Howes Associates

  7. BRT-Lite Alan Howes Associates

  8. BRT-Heavy(BHLS) Alan Howes Associates

  9. Full BRT Alan Howes Associates

  10. Key Features • Stations and Stops • Pedestrian Access • Integration with other modes • Overall speed • Image Alan Howes Associates

  11. Commercial Speed Alan Howes Associates

  12. BRT Congestion Alan Howes Associates

  13. Transit Choice - Dubai Alan Howes Associates

  14. Transit Choice - Dubai • Metro Red Line – Downtown to Jebel Ali • 40 kms by rail • 18 intermediate stations • 52 minute journey time • 46 kph • Former Express Bus 91A (non-stop) • Same distance • 35 minutes (though could be longer – no Priority) • 68 kph • And it actually went to the Industrial Area! Alan Howes Associates

  15. Transit Choice – Edinburgh Tram • Originally • Budget £375m • Length 24 km • Opening Feb 2011 • Latest • Spend ≈ £1 bn • Length 13 kms • Opening 2014? Alan Howes Associates

  16. Thank You Alan Howes Alan Howes Associates

More Related