140 likes | 220 Views
RAN 4 Report RP-070277. Howard Benn. Summary. 2 meetings since last RAN meeting Adhoc in Sophia Antipolis, main meeting in Kobe Consistent number of delegates (around 100) 400 input contributions in Kobe Corrections to the specification (cat B,C & F numbers) Release 99 – CRs
E N D
RAN 4 ReportRP-070277 Howard Benn RP-070277 Slide 0
Summary • 2 meetings since last RAN meeting • Adhoc in Sophia Antipolis, main meeting in Kobe • Consistent number of delegates (around 100) • 400 input contributions in Kobe • Corrections to the specification (cat B,C & F numbers) • Release 99 – CRs • Release 4 – CRs • Release 5 - CRs • Release 6 – CRs • Release 7 - CRs • There will be 2 WG meeting before the next plenary. RP-070277 Slide 1
R99 – Rel-5 Highlights • R99 • Category B spurious emission limits for TDD BS and repeater reflecting new limits agreed with CEPT/ECC • Rel – 4 • Rel – 5 • Correction to Node B test model • Corrections to low chip rate TDD HSDPA • Looking at a new method to measure the CQI reporting, this is probably take a few meetings to resolve RP-070277 Slide 2
Rel-6 Highlights • TEI-6 RP-070277 Slide 3
TEI - 7 • High speed train requirements • Uplink and downlink simulations completed • CRs with performance requirements approved • Correction of Test Case for Inter-system Handover from UTRAN FDD to GSM • Introduction of band X into the repeater specification • Repeater ACRR description • RRM test cases for UE with multiple receive antennas • Result of RAN 1 CR on linear average • Work needed to complete CR RP-070277 Slide 4
TEI-8 • Proposal to add 15 code 16 QAM requirements • Request to spec clock accuracy on IuB • Passed to plenary for discussion of which working group this falls under RP-070277 Slide 5
Work and Study Items RP-070277 Slide 6
Highlights • MIMO • Work continues • Low Chip rate E-DCH • Simulation results presented • CRs approved • UE Antenna Performance Evaluation Method and Requirements • Discussion continues • Proposal to work with COST 2100 • Follows on from COST273 • LMU performance spec • Simulation assumption presented • Initial simulation results • Work continues RP-070277 Slide 7
Improved performance requirements • Further Improved Performance Requirements for UMTS/HSDPA UE (FDD) • Dynamic reconfigurable receivers • Questions raised on impact to network RP-070277 Slide 8
Others • CPC • Simulation results presented for ideal and implementation margin • Demod performance CR approved • 16 QAM uplink • Work proceeding • One more meeting cycle needed • 64 QAM downlink • Work proceeding • Performance CRs approved • Few issues – see status report • One more meeting cycle needed RP-070277 Slide 9
MBSFN • New channel model under discussion • First set of simulations performed • Type 3i performance requirements • Discussed testing scenarios to reduce complexity • UMTS 1500 • TR approved • Enhanced cell FACH testing • Question over which release performance requirements should be in ? RP-070277 Slide 10
Interference mitigation study item • Simulations showed limited performance improvements • Agreed no need to standardise performance • Home Node B • Work started • Conference call before the Orlando meeting to progress the work RP-070277 Slide 11
LTE • Close to being on schedule • Channel options below 5 MHz • 1.4 MHz and 3 MHz proposed by a number of companies but not agreed • PHS co-existence • Still working on a solution • UE TR • Baseline transmitter requirements agreed • Baseline RF receiver performance agreed • Channel models agreed • Work plan for demodulation requirements agreed RP-070277 Slide 12
Meeting schedule RP-070277 Slide 13