P 1.5 Gate 0 Development Team

P 1.5 Gate 0 Development Team. P 1.5 Gate 0 – Meeting Agenda. I. Introduction Haller II. RTDP Summary A. Emulsion Technology J B. 529A Z III. Film Formulation & Cost Savings Haller IV. KMCP/Manufacturability Status A. Materials 1. Emulsions B 2. Dispersions D/W

iram
Download Presentation

P 1.5 Gate 0 Development Team

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. P 1.5 Gate 0Development Team

  2. P 1.5 Gate 0 – Meeting Agenda I. Introduction Haller II. RTDP Summary A. Emulsion Technology J B. 529A Z III. Film Formulation & Cost Savings Haller IV. KMCP/Manufacturability Status A. Materials 1. Emulsions B 2. Dispersions D/W B. Sensitizing H/R/K C. Finishing F D. HSE M E. Patent/Legal H/Z V. Systems F/B VI. Closing Haller A. KMCP Check List/Schedule B. Risks/Concerns C. Conclusions/Recommendations D. Discussion/Signing

  3. P 1.5 Gate 0 – Introduction • P 1.5 is the last of a long line of cost reduction programs aimed at: • Transparent introduction • Minimizing impact on customer performance features • Spreading Ag reductions over a number of evolutionary steps • The P programs encompass a number of changes including coupler and emulsion changes to reduce Ag coverage and product cost • The sequence of the P programs is alsoimportant in that some technologies need tobe introduced at certain times to enableother technology introductions

  4. P 1.5 Gate 0 – Introduction • P 1.5 currently contains the following technologies: • 529A at 10% of the Cyan imaging coupler – more reactive than current ACQ coupler and new coupler solvent set and level • Higher gel laydown in the cyan record to maintain gel/junk ratios in the cyan with higher coupler solvent 529A/ACQ coupler blend and higher SOC lube levels to maintain POD performance • New Slow Cyan emulsion for improving the process sensitivity response with the 529A coupler • Potential faster Fast Cyan emulsion to enable more Ag reduction and improve process sensitivity (through lower FC blend ratio)

  5. P 1.5 Gate 0 – IntroductionChanges across Print Products • Vision: • Implementing 529A at 10% • Implementing the new slow cyan and faster fast cyan emulsions • Additional gel to cyan layer and higher M160 wax level in the SOC • Premier: • P 1 slow yellow • P 2 slow cyan and faster fast cyan emulsions • 70 MM and A: • P 1 slow yellow • P 2 slow cyan and faster fast cyan emulsions

  6. P 1.5 Gate 0 – Risk/Concerns at Gate C • Level 2 • Process sensitivity change with 529A • Color reproduction with 20% 529A (concern with future P programs) • Level 1 • Color reproduction with 10% 529A • Dark fade degradation • 529A polymorphism (HAZE test in place) • HPLC T-power testing accuracy

  7. P 1.5 Gate 0 – Risk/Concerns at Gate C Gate 0 Level 3 0 Level 2 1 Level 1 4

  8. P 1.5 Gate 0 – Customers/Sponsors • Sponsor: • MR EI WW Film Technologies • Customers: • EM EI WW Print/Distribution SPG • JG Global Capture Flow • TZ GECF RFS Sensitizing • Customer Representatives • GB Global Capture Flow • FG GECF RFS Sensitizing • LX EI WW Print/Distribution SPG • FD EI CTS

  9. P 1.5 Gate 0Closing

  10. P 1.5 Gate 0 ClosingStoplight Chart Status • All items complete • Ready to proceed to Gate 2

  11. P 1.5 Gate 0 Closing - Schedule

  12. P 1.5 Gate 0 ClosingRisks/Concerns • Process sensitivity change with 529A [C/Chris - Level 2]STATUS: Making adjustments to the aim to account for the shift. Will also attempt to minimize shift with formulation/emulsion changes. • Impact of Ag price and component changes on UMC savings for Pearl 1.5 [C/B, Level 2]STATUS: The cost savings changes radically depending on pricing standards – will attempt to increase Ag savings to improve position. (NEW) • Color reproduction with 10% 529A [C/P, Level 1]STATUS: No issues seen in recent demos– will confirm in additional demos

  13. P 1.5 Gate C/0 ClosingRisks/Concerns • Dark fade degradation [C, Level 1]STATUS: Will verify dark fade position,not expecting an issue due to productusage. • 529A polymorphism (HAZE test in place) [SW - Level 1]STATUS: Will monitor future batches for haze specification. • HPLC T-power testing accuracy [TR, Level 1]STATUS: Test developed and in place – need experience with future batches.

  14. P 1.5 Gate C/0 ClosingRisks/Concerns Gate 0 Level 3 0 Level 2 2 Level 1 4

  15. P 1.5 Gate C/0 ClosingConclusion • Initial sensitometric and physical tests have been within or close to specifications for both the wide and narrow coatings. • Coating quality was seen to be comparable to current product. • Phase C activities for both the 529A and new emulsions are completed. • Fluctuations with silver and component prices continue to have a significant impact on cost saving potential for the P programs.

  16. P 1.5 Gate C/0 ClosingRecommendations • Based on the data and information, the team recommends the following: • Passage of Gate 0 for P 1.5 • Continue to address the risks facing P 1.5 in a timely and efficient manner • Update formulation to meet the new modified aims • Ramp-up of P 1.5 coatings and customer assessments • Continuation of work to drive to Gate 2