70 likes | 237 Views
H. FPSO. NOT TO SCALE. STAGE 1. Wx. BUOY. 100m. F.R.C. AT END OF LINE AS MARKER POINT ONLY. F.R.C. SMALL TUGS ON STBD SIDE AS CONTINGENCY TO PULL HB AWAY FROM BUOY IF REQUIRED. NO THRUSTERS USED. H. FPSO. NOT TO SCALE. STAGE 2. Wx. BUOY. 100m. NO THRUSTERS USED.
E N D
H FPSO NOT TO SCALE STAGE 1 Wx BUOY 100m F.R.C. AT END OF LINE AS MARKER POINT ONLY. F.R.C. SMALL TUGS ON STBD SIDE AS CONTINGENCY TO PULL HB AWAY FROM BUOY IF REQUIRED. NO THRUSTERS USED
H FPSO NOT TO SCALE STAGE 2 Wx BUOY 100m NO THRUSTERS USED F.R.C. CONNECTS MESSENGER LINE TO END OF BUOY. F.R.C.
H FPSO NOT TO SCALE STAGE 3 Wx BUOY NO THRUSTERS USED HB MOVES FORWARD WHILST HEAVING ON MESSENGER LINE.
H FPSO NOT TO SCALE STAGE 4 Wx NO THRUSTERS USED BUOY 100m HB ABEAM OF BUOY WITH LINE TAUT.
H FPSO NOT TO SCALE STAGE 5 Wx THRUSTERS USED TO MOVE HB TO PORT UNTIL ABOVE BUOY. BUOY
H FPSO NOT TO SCALE STAGE 6 CONTINGENCY SHOULD THRUSTERS FAIL AT STAGE 5 Wx THRUSTERS USED TO MOVE HB TO PORT UNTIL ABOVE BUOY. BUOY SMALL TUGS ACT AS BRAKE TO STOP HB OVER BUOY.