Report of MCC Activities since PCG#14 Adrian Scrase MCC

Report of MCC Activities since PCG#14 Adrian Scrase MCC. Table of Contents. 3GPP Reorganization Corresponding MCC Reorganization Workload Performance Resources Problems Conclusions. 3GPP Reorganization (1). TSG Reorganization now completed

iris-morris
Download Presentation

Report of MCC Activities since PCG#14 Adrian Scrase MCC

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Report of MCC Activities since PCG#14Adrian ScraseMCC

  2. Table of Contents • 3GPP Reorganization • Corresponding MCC Reorganization • Workload • Performance • Resources • Problems • Conclusions

  3. 3GPP Reorganization (1) • TSG Reorganization now completed • New Technical Bodies in place and old Technical Bodies closed • New leadership appointed and in place • Summary of the new organization given in following slide

  4. 3GPP Reorganization (2)

  5. MCC Reorganization (1) • TSG Reorganization led to a re-allocation of MCC resources • An opportunity for a “change of scenery” for some experts • Core competences retained • Transfer of responsibilities achieved without interruption to service level • No departures or new arrivals since PCG#14 (except-----)

  6. MCC Reorganization (2) Lisa Ishii born Saturday 24 September 2005

  7. Workload (1) • Workload is not decreasing • RAN LTE has led to a resurgence of interest • TSG and WG meeting participation shows a growing trend • Number of contributions shows a rising trend • Number of CRs shows a rising trend (following Rel 6 freeze)

  8. Workload (2) Specifications by Release (pre TSG#29)

  9. Workload (3) CRs by year and Release (pre TSG#29)

  10. Workload (4) Release ’99: stable Release 4: stable Release 5: CRs reducing Release 6: work now starts!

  11. Performance • Targets for delivering specifications after each TSG meeting consistently being met: • 90% delivered within 2 weeks • 100% delivered within 3 weeks • Error rate static at 0,3% (or 3 errors in 1000 implementations) • All regular WG meetings being supported (even using substitution for collocated meetings)

  12. Resources • MCC Resources for 2005 have been reduced (below the budget allocation) • Rationalization results in 0,5 expert saving • One MCC Assistant now working 80% • Resources are now at the minimum level without imposing a degradation of service • Support sought for the 2006 Budget request to enable service continuity

  13. Problems (1) • IT services at TSG/WG meetings are provided on a “best effort” basis • Provision of service is executed by TSG/WG Secretaries on a goodwill basis • Delegate expectations are higher due to experiences in other bodies where professional support is provided (eg OMA) • Internet access is a particular problem • Any tangible increase in service level implies budget increase • PCG advice sought!

  14. Problems (2) • Many WGs are now holding collocated meetings • Such meetings become very large and introduce logistic challenges • Collocation of groups reduces the possibility to reuse MCC experts

  15. Conclusions • MCC functioning well • Staff/experts turnover at a consistent level (at around two experts per year) • Resources now trimmed to the limit • Service level being maintained • Some frustration in not being able to deliver the IT service level expected from the community • Working environment remains healthy and conducive to high output

More Related