1 / 8

Flex PLI GTR Status

GTR9-1-08r1. Flex PLI GTR Status. Informal Group GTR9 PH2. 1-2 December 2011 Bernard Been. GTR9-1-08r1. Content. Number of GTR legs manufactured Flex Status Leg availability. GTR9-1-08r1. Number of GTR Legs Made. 3 JARI prototypes 3 Humanetics for internal testing, demo and CAE

irmae
Download Presentation

Flex PLI GTR Status

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. GTR9-1-08r1 Flex PLI GTR Status Informal Group GTR9 PH2 1-2 December 2011 Bernard Been

  2. GTR9-1-08r1 Content • Number of GTR legs manufactured • Flex Status • Leg availability

  3. GTR9-1-08r1 Number of GTR Legs Made • 3 JARI prototypes • 3 Humanetics for internal testing, demo and CAE • 22 customer legs have been sold • 12 legs are on order • All customer legs have onboard DAS • Some with optional addition channels up to 24

  4. GTR9-1-08r1 Flex Status • All production legs have Vinyl ester bones (more durable) Some prototypes have been updated to Vinyl ester • All legs were build passing agreed GTR static component corridors • All production legs pass GTR Pendulum corridors • T3 and T4 are usually high and MCL is generally low • Production legs consistently fail some Inverse GTR corridors • some tibia moment channels are too low • failure very repeatable • 4 different batches of Vinyl ester bone have been used • From test experience Humanetics currently manufactures bones to be as close to GTR inverse corridors as possible

  5. GTR9-1-08r1 Example 2011 Production Pendulum Results

  6. GTR9-1-08r1 Example 2011 Production Inverse Results

  7. GTR9-1-08r1 Leg Availability for Testing • Humanetics proposes at least 6 legs should be tested for corridor definition at 6 labs minimum after they have been checked and certified • Availability of legs for testing would depend on customer co-operation • Humanetics would make their internal leg available for testing

  8. GTR9-1-08r1 Thank you for your attention!

More Related