1 / 7

28 Oct 2003 particle stream timing

28 Oct 2003 particle stream timing. after Klassen, Krucker, et al. 2005, JGR 110, A09S04. 30 km/s. Gap. 35-50 Mm. Red: TS Yellow: continuum with fiber bursts. Overview all sources 11-12 UT. Pmin. 300 MHz 800. AIP. 300 800 MHz 1300. AIP AOO.

Download Presentation

28 Oct 2003 particle stream timing

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. 28 Oct 2003 particle stream timing after Klassen, Krucker, et al. 2005, JGR 110, A09S04

  2. 30 km/s Gap 35-50 Mm Red: TS Yellow: continuum with fiber bursts Overview all sources 11-12 UT Pmin

  3. 300 MHz 800 AIP 300 800 MHz 1300 AIP AOO 11:12 11:13 11:14 UT 11:14 11:15 11:16 11:17 11:18 UT 11:19 Fibers during relativistic (GLE) proton injection (time derived radio spectra) Courtesy: M. Karlicky

  4. Field lines selected by fiber burst sources (I) Cartesian potential field extrapol. 11:13-11:14 and 11:17-11:19 11:13-11:14 Cubes: NRH source sites of fiber bursts Method: A&A 435, 1137 (2005)

  5. Field lines selected by fiber burst sources (II) Spheric potential field extrapol. (Schrijver & DeRosa 2003)

  6. near AR 10493 AR 10486 Magnetic field around AR 10486 150-300 Mm acc. to Schrijver & DeRosa 2003

  7. N Essential mean field structures selected by fiber bursts S Main flaring arcade Multi-loop structure during GLE proton injection

More Related