70 likes | 191 Views
28 Oct 2003 particle stream timing. after Klassen, Krucker, et al. 2005, JGR 110, A09S04. 30 km/s. Gap. 35-50 Mm. Red: TS Yellow: continuum with fiber bursts. Overview all sources 11-12 UT. Pmin. 300 MHz 800. AIP. 300 800 MHz 1300. AIP AOO.
E N D
28 Oct 2003 particle stream timing after Klassen, Krucker, et al. 2005, JGR 110, A09S04
30 km/s Gap 35-50 Mm Red: TS Yellow: continuum with fiber bursts Overview all sources 11-12 UT Pmin
300 MHz 800 AIP 300 800 MHz 1300 AIP AOO 11:12 11:13 11:14 UT 11:14 11:15 11:16 11:17 11:18 UT 11:19 Fibers during relativistic (GLE) proton injection (time derived radio spectra) Courtesy: M. Karlicky
Field lines selected by fiber burst sources (I) Cartesian potential field extrapol. 11:13-11:14 and 11:17-11:19 11:13-11:14 Cubes: NRH source sites of fiber bursts Method: A&A 435, 1137 (2005)
Field lines selected by fiber burst sources (II) Spheric potential field extrapol. (Schrijver & DeRosa 2003)
near AR 10493 AR 10486 Magnetic field around AR 10486 150-300 Mm acc. to Schrijver & DeRosa 2003
N Essential mean field structures selected by fiber bursts S Main flaring arcade Multi-loop structure during GLE proton injection