South Dakota Gas Pipeline Safety Program. 2011 Summary. State Program General. Number of operators 2011 year end total 13 # of additions since 2010 1 # of deletions since 2010 1 Comments Number of inspectors 2011 year end total 1.1 Change from year end 2010 0.

Download Presentation

South Dakota Gas Pipeline Safety Program

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. South Dakota Gas Pipeline Safety Program 2011 Summary

  2. State Program General • Number of operators • 2011 year end total 13 • # of additions since 2010 1 • # of deletions since 2010 1 • Comments • Number of inspectors • 2011 year end total 1.1 • Change from year end 2010 0

  3. Program Operational Overview • 2 inspectors: Josh 85 %, Nathan 28 % inspector, 72 % Program Manager • 85 inspection days per year required, 126 in 2011 • Complete regulation review once every two years • Year 1 (2011): corrosion, patrolling, leak surveys, OQ, TIMP • Year 2 (2012): welding, fusion, drug and alcohol, DIMP, PA

  4. Municipals Crooks Municipal Gas Garretson Municipal Gas Humboldt Municipal Gas Watertown Municipal Gas Private Distribution Mid-American Energy Montana-Dakota Utilities Northern Natural Gas NorthWestern Energy Transmission Basin Groton CT Pipeline Basin Deer Creek Black Hills Power Montana-Dakota Utilities NorthWestern Energy South Dakota Intrastate Pipeline Sioux Falls Sanitary Landfill Gas Pipeline Xcel Angus Anson Pipeline Covered Operators (13)

  5. 2010 Year End Gas Statistics for South Dakota • Gas transmission mileage 222 • Gas distribution mileage 4,483 • Number of gas services 202,990

  6. SD Gas Distribution Federal Reportable Incident Summary1998 – 2011

  7. Enforcement Statistics 2011

  8. Declaratory Ruling -Pipeline Classification • It is possible to have a transmission line under 20 % SMYS. • A distribution center begins at the location of title transfer. • A pipeline feeding a large volume customer is no longer distribution if it is < 20 % SMYS but must be downstream of a distribution center to be distribution. • This could affect operators that may in the future have a large volume customer tapped into an interstate transmission line at a point other than a distribution center with a line operating at < 20 % SMYS.  In such a case, this may now possibly be transmission rather than distribution.

  9. Major Construction Activity • None • System expansion activity in distribution systems • No new transmission lines

  10. Special Permits Requested / Granted • None in 2011

  11. 2011 Highlights • Completed TIMP Protocol A inspections on all transmission operators • Completed 5 public awareness inspections with new form • Completed 5 DIMP inspections • Josh Williams completed majority of training for new inspectors • Made recommendation to implement mandatory damage reporting • Conducted 3 construction inspections • Participated on federal/state DIMP implementation team • Coordinated and led a joint multi state DIMP inspection

  12. 2011 Highlights Continued • Completed comprehensive OQ plan and field audits on all operators • Inspected all operators in following areas: • Corrosion and cathodic protection • Line markers • Patrolling • Leakage surveys • Emergency valves • Excess flow valves • Pipe on structures

  13. Pipeline Program Metrics 2010

  14. 2012 Outlook • Cast iron/bare steel replacement begins in Sioux Falls • One Call Board decision on supporting mandatory damage prevention • Records Inspections: • reporting requirements and emergency plans • test requirements • welding and fusion • damage prevention • MAOP, regulator and relief valves • Drug and alcohol inspections • Plan and operator records • Provider site inspections

  15. 2012 Outlook Continued • New regulations • Finish DIMP inspections • Begin Control Room Management inspections • Finish Public Awareness inspections with new form • Training - Webinar on Pipeline Safety, Regulatory Certainty and Job Creation Act of 2011 • Inspector Training: • Complete 3 remaining T & Q courses by pipeline staff • Inspector training outside of T&Q Courses (NACE certification, IMP, etc.) • Operator Training: • Hold quarterly operator training webinars • Preparations to host 2013 Pipeline Safety Operator Training Seminar