An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Introduction

  2. Status of write-up: • Not yet complete, some analysis (schedule for example) still being worked on (we’ll see first results today): • But, it will be a good report reflecting the enormous amount of excellent work that has been done on the problem • Sections to be completed: • In description of BaseLine: • Tracker shielding; and • Rack shielding • In description of yoke: • Implementation in the MICE Hall • See Jason’s WORD file – still needs to be integrated in LaTeX • Cost and schedule • First sight of this today • Recommendation: • Will draft this following discussion today and later in the week • Sections needing editing: • Edits required to slim down BaseLine description to some extent

  3. Principal issues: • Baseline: • Results indicate that can shield at Step IV • How do we quantify the risk? • PRY required for Step V/VI because of coupling coil and the likelihood that SSB (e.g. ISIS control rooms) will see a significant field • PRY: • Results indicate that integration in the Hall at Step IV can be accommodated with modest modifications to existing infrastructure; • Significant modifications are required for Steps V/VI, but, we have time to plan and have a lot of engineering to do in any case • Schedule (and cost which in the end will influence the schedule): • Judgment call required when we see the schedule

  4. Decision making process: • This group needs to form its opinion: • Can this be done today? We’ll see • Then: • VC Thursday and EB Friday • MIPO: • Still don’t have an overall cost available. Breakdown in UK and US not available and resource-loaded schedule not available either. • In the end probably a MIPO decision • But this is the expert group and we need to express our opinion • If not today then I propose we make a special Mag. Shld. Meeting Monday 16Sep13 in the afternoon (14:00?)