An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. ElectroMagnetic Compatibility in Cable Tray Systems Ed Cronin, RCDD, President, Cronin Consulting Claes Rosenberg, Export Manager, Defem System/Schneider Electric

  2. EMC Research Consortium

  3. Definition of ElectoMagnetic Compatibility ”The ability of a device, equipment or system to function satisfactorily in its electromagnetic environment without introducing intolerable electromagnetical disturbances to anything in that environment” Source: 2008 International Electrical Committee (IEC)

  4. EMC in the Data Room • The metal cable tray is part of the electrical structure • The metal cable tray is part of the metallic structure • Any metallic structure is known as a “generalized shield”

  5. Definition of generalized shield • To function as a generalized shield, the metal does not have to be enclosing the cable. Any continous metal along the cable is a shield. • A shield is any metal structure that is continous and parallel along the cable path

  6. Metal Cable TrayQuick Facts • Properly bonded and grounded = ”earth” • Poorly bonded and grounded = ”antenna”

  7. Background • July 2007 - EU introduces new EMC directive • It states that any electrical installation shall be made according to ”good engineering EMC practice”

  8. EU Directive ...”installer must document that the EMC performance of complete installation is made according to ”good engineering practice” ... Source: EMC Directive 2004/108/EC

  9. Common EMC Problems • “Come and go problems” • Lightning strike • on/off transients • radio transmission • “Slow down problems” • Disturbances may force packaged signals to be re-packaged and re-sent

  10. Principles of Generalized Shield Equipment Metal structure Cables Differential mode

  11. Various Shield Structures

  12. Principles of Earth Loop Area Reduction

  13. Principles of Earth Loop Area Reduction

  14. Principals of Earth Loop Area Reduction

  15. Principles of Earth Loop Area Reduction

  16. Tray Design • Minor Importance • wire mesh • solid metal tray • perforated metal tray • cable ladder …are all “shield” when properly installed

  17. Schneider Electric tests performed with Defem cable tray

  18. Ultimate installation Tray directly connected to top of cabinets Floor is Ground Reference Plane.

  19. Realistic installation Tray connected with short ground wire to top of both cabinets

  20. Possible installation Tray connected with long ground wire to low point of both cabinets

  21. Poor installation Tray connected once with a single ground wire to one cabinet

  22. Schneider Electric Results

  23. Test Conclusions • Single ground connection • Tray connected to one cabinet only • worse than no metal tray at all • creates a disturbance • Continous tray installation • Tray from cabinet to cabinet • best option • not realistic for practical reasons

  24. Test Conclusions • Realistic installation • Sort ground wire between tray and all cabinets • clear improvement • Critical Parameter • connection between cable trays and cabinets • continuity of generalized shield

  25. Other Conclusions • Source and victim cables at bigger separation distance does not compensate for a badly connected cable tray. It is still contagious…

  26. Good Engineering Practices • IEC Standards • To use gasfree and vibration safe joinings of tray, ensuring max 50mΩ • To mark tray joints with a bonding sign • To connect metal cable trays to all cabinets with ground wire, preferrably at cable entrance

  27. Good Engineering Practices Place cables as close as possible to parallel earth conductor

  28. Good Engineering Practices Additional cables will enhance external shielding effect

  29. Good Engineering Practice With multi level cabling, ground wire connection between tray levels

  30. Take Away • Properly bonded and grounded = ”earth” • Poorly bonded and grounded = ”antenna”

  31. Thank You • Claes Rosenberg – Defem • Ed Cronin RCDD – Cronin Consulting