170 likes | 296 Views
Oil & Gas Group. Oil & Gas Group. QLD Group established in July 2010 & it`s still at it`s infancy stage Similar model to WA – in partnership with SPE and mainly focus on Technical Events Current 4 Committee members and hold 4 events
E N D
Oil & Gas Group • QLD Group established in July 2010 & it`s still at it`s infancy stage • Similar model to WA – in partnership with SPE and mainly focus on Technical Events • Current 4 Committee members and hold 4 events • Focus on Facilities aspect of industry and multi-disciplinary group that involve Process, Civil & Structural, Electrical & Instruments, Mechanical & Pipeline Engineering
Other Associations There are already 4 Association and Societies in this industry
Oil & Gas Industry • Upstream Sector (Exploration & Production) Upstream include searching for potential Underground or Underwater Oil & Gas fields, drilling of exploratory wells, and subsequently operating the wells that recover and bring these hydrocarbons to the surface • Midstream Sector Midstream include Processing at Surface , Storage & Transporting these Hydrocarbons to the Downstream Sector • Downstream Sector Downstream include Refining and Distribution of Hydrocarbons and their products and consist of Oil Refineries, Petrochemical Plants, Petroleum Product distribution, Retail outlets and conventional/unconventional Gas distribution companies.
Upstream Downstream • Midstream
Projects in Australia • According to numbers by Pitcrew Management Consultants, Australia now has a total of 456 projects in the construction pipeline with 272 of those already committed and/or under construction, with a combined value of $424b • Another 184 projects are in the pipeline awaiting Final Investment Decision. Conservative estimations are that approvals for at least $50-80b worth of additional project value will be announced in the next 12 months.
LNG Projects in QLD • GLNG – Gladstone LNG Santos – JV with Petronas, Total & KoGas • APLNG – Asia Pacific LNG Origin Energy, JV with Conoco, Sinopec • QCLNG – Queensland Curtis LNG QGC – Parent company British Gas (BG) • Arrow LNG Arrow Energy Parents companies Petro-China
C-Triangle ? • Client (Owner/Operator) Include sub-surface & surface team. Usually Project Engineers to run the project team and small engineering team to support Operation to run the asset • Consultant (Design)Focus on design and have Technical discipline: Process, Mechanical, Electrical, Civil & Structural, Geotechnical, Environmental • Construction (Execution) Include construction crew and usually require engineering team to support them from the field or the office
Upstream – CSG Field • Drilling & Completion of the well • Installation of the wellhead production skid • Low Pressure Gathering line (Pipeline) • Gas Facilities and Compressor Stations • Water Facilities and Treatment Plant
Mid-stream Pipeline • 450 to 600 Km of High Pressure Pipeline • 10MPa Pressure and 45” Diameter • Feeding the Gas from the Upstream (Gas Field) to the Downstream (LNG Plant)
Downstream LNG Plant • Liquefying the Gas by lower temperature to -165 and compressing it • Involve Mercury, CO2 removal