BUS 517Assignment 2: Project Scope
Download Here:
http://www.homework-aid.com/BUS-517Assignment-2-Project-Scope-Strayer-154.htm
This assignment builds on Assignment 1 to provide the necessary scope for your project. A project scope includes many variables, the Work Breakdown Structure (WBS) that must be defined prior to the start of the project to ensure that all of the details are planned. In the form of an Excel spreadsheet, Word table, project-specific software, etc., prepare a checklist document that identifies the critical steps in planning the project scope and complete the checklist in accordance with your project. Provide an explanation for how the project scope checklist should be used to thoroughly document the project.
170 views • 1 slides