By: Sugiharto Harsoprayitno, M.Sc Director of Geothermal Enterprise Supervision and Groundwater Management

MINISTRY OF ENERGY AND MINERAL RESOURCES . DIRECTOR ATE GENERAL OF MINERAL, COAL AND GEOTHERMAL. By: Sugiharto Harsoprayitno, M.Sc Director of Geothermal Enterprise Supervision and Groundwater Management. GEOTHERMAL DEVELOPMENT IN INDONESIA. APEC EWG 38, BALI November 2009. OUTLINE.

isla
Download Presentation

By: Sugiharto Harsoprayitno, M.Sc Director of Geothermal Enterprise Supervision and Groundwater Management

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. MINISTRY OF ENERGY AND MINERAL RESOURCES DIRECTORATE GENERAL OF MINERAL, COAL AND GEOTHERMAL By:Sugiharto Harsoprayitno, M.ScDirector of Geothermal Enterprise Supervision and Groundwater Management GEOTHERMAL DEVELOPMENT IN INDONESIA APEC EWG 38, BALI November 2009

  2. OUTLINE • Geothermal Policy • Geothermal Development Plan 2

  3. Geothermal Policy

  4. Implementation of Geothermal Policies Existing WKP New WKP • President Decree No 45/1991, No 49/1991, and No 23/1992 • Business structure based on JOC and ESC • 34% of Net Operating Income (NOI), that had included all kinds of taxes and retribution, except personal tax. • Project Management : Under Pertamina (JOC) and PLN (ESC) • Project Type: • Total (Integrated) Project • Partial Project • Selling Price: In US Dollar • Law No. 27/2003 • Business structure in the form of Permit: • Geothermal Mining Permit • Enterprise Permit for Electricity • Obligation to pay for taxes and royalty • Project Management :Under Permit Holder • Project Type: Total (Integrated) Project WKP holder will be granted as generally plan operation • Selling Price : In Rupiah 4

  5. Government Regulations • Law No. 27/2003 on Geothermal • Government Regulation No. 59/2007 on Geothermal Business Activities • Ministerial Regulations • MEMR Regulation No. 11/2008 on Mechanism for Determining Geothermal Working Area • MEMR Regulation No. 02/2009 on The Guidelines for Geothermal Pre-Survey Assignment • MEMR Regulation No. 05/2009 on The Guidelines for Electricity Purchasing Price by PT. PLN from Cooperation and Other Business Entities • MEMR Regulation No. 11/2009 on The Guidelines for Geothermal Enterprises 5

  6. MEMR Regulation No. 02/2009 on The Guidelines for Geothermal Pre-Survey Assignment • Pre-Survey Assignment to Business Entities is given to accelerate geothermal development in green field (before determined as WKP) • The Minister determines areas for Pre-Survey Assignment and offers them through medias and forums by Director General • Business Entities propose Pre-Survey Assignment request to The Minister attn. Director General cc: Head of Geological Agency, governor and regent/mayor • Application process uses first come first served system • One Business Entity can get one area of Pre-Survey Assignment • Pre-Survey Assignment has to be finished in one year (max) 6

  7. MEMR Regulation No. 05/2009 * on The Guidelines for Electricity Purchasing Price by PT. PLN from Cooperation and Other Business Entities • In designing the electricity purchasing, PT. PLN is obligated to make their own estimated price based on type of generation, location, capacity quantities, capacity factor and also some assumptions such as: level of local content components, fuel price, exchange rate and other macro economic indicators • PT. PLN request for approval of the electricity purchasing price to Minister of Energy and Mineral Resources • The electricity purchasing price can be adjusted considering on macro economic indicators and based on agreement (Power Purchase Agreement) * Under Reviewed 7

  8. Government Regulations Continued… • Tax facilities are provided in accordance with the Tax Regulations: • Government Regulation No. 62/2008 jo No. 1/2007 on Income Tax Facilities for Investment in Certain Business Fields and/or Certain Regions → 30% (thirty percent) net tax deduction of the total Investment, charged for 6 (six) years for 5% (five percent) annually → Income tax charge for dividend paid to Foreign Tax Subject shall be 10% (ten percent), or lower tariff according to effective Double Taxation Avoid Agreement • MoF Decree No. 177/PMK.011/2007 on Custom Duties Exemption of Import Items for Upstream Activities in Oil & Gas and Geothermal & MoF Decree No. 242/PMK.011/2008 on Value Added Tax of Import Items Covered by Government for Upstream Exploration Activities in Oil & Gas and Geothermal on 2009 Budget → for the items haven’t been produced in Indonesia → for the items have been produced in Indonesia but they haven’t complied with the specification needed or the amount is insufficient 8

  9. GEOTHERMAL WORKING AREA (WKP) 9

  10. Geothermal Development Plan

  11. Projection of Power Generation Capacity Needed (based on RUKN 2008 – 2027) 30,345 MW → Installed Capacity as of March 2009 • Assumption: • Reverse Margin 30 % 11

  12. Geothermal potency 27 GW or equivalent to 219 Billions barrel of oil Installed Capacity 1,179 MW (4.3% of whole potency) Geothermal Road Map Target 9,500 MW in 2025 Resource Potency 12

  13. Geothermal Area Distribution Map Source : Geological Agency, MEMR (2008) 13

  14. Geothermal Potential Distribution 14

  15. Existing Geothermal Production Areas 15

  16. (Based on President Decree No. 5/2006 on National Energy Policy) 2006 2008 2012 2016 2020 2025 2014 9500 MW (Target) 852 MW (Production) 2000 MW 3442 MW 4600 MW 6000 MW 1158 MW Existing WKP + New WKP 1148 MW Existing WKP 1442 MW Existing WKP 1400 MW New WKP 3500 MW New WKP 1.179 MW 5.795 MW Current Condition Plus Crash Program Scenario Phase II WKP : Geothermal Working Area The Road Map of Geothermal Development 2006 – 2025 16

  17. Geothermal Contribution on 10,000 MW Power Development Acceleration Program Phase II Notes: PLTU : Coal Fired Power Plant PLTGU : Combine Cycle Power Plant PLTP : Geothermal Power Plant PLTA : Hydro Power Plant 17

  18. Distribution Area for Geothermal Development Plan 2009 – 2014 (Based on 10,000 MW Power Development Acceleration Program Phase II) 4733 * in MW *) Total additional installed capacity 2009 - 2014 18

  19. save about 200,000 barrel oil per day (1 MW equivalents to 42 barrel per day) reduce emission about 28,398,000 t CO2/Year (6,000 t CO2e/MW/Year) With Developing 4733 MW Geothermal Power Plant until 2014, could: 19

  20. New Geothermal Working Areas (WKP) Offered Through Tender Process (after Law No. 27/2003 on Geothermal) As of Sept 2009

  21. The Result of WKP’s Tender 21

  22. Geothermal Pre-Survey Assignment in 2008 22

  23. Geothermal Pre-Survey Assignment in 2009 Areas offered for Pre-Survey Assignment 23

  24. THANK YOU MINISTRY OF ENERGY AND MINERAL RESOURCES REPUBLIC OF INDONESIA DIRECTORATE GENERAL OF MINERAL, COAL AND GEOTHERMAL DIRECTORATE OF GEOTHERMAL ENTERPRISE SUPERVISION AND GROUND WATER MANAGEMENT Jl. Prof. Dr. Supomo, SH. No. 10 Jakarta 12870 Phone : +62 21 83702847 Fax.: +62 21 83785103 www.djmbp.esdm.go.id