LGCDP - Progress, Opportunities & Challenges

Learn about LGCDP's achievements in promoting social inclusion, gender equity, and capacity building in local governance to reduce poverty. The program emphasizes aid effectiveness, harmonization, and service improvement through a process-driven approach. Opportunities for capacity grants, rights-based development, and balanced demand-supply sides are key areas of focus.

ismael
Download Presentation

LGCDP - Progress, Opportunities & Challenges

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. LGCDP - Progress, Opportunities & Challenges Som Lal Subedi National Programme Director

  2. Why LGCDP Poverty reduction through improved services Strengthening both supply & demand sides of local governance Aid effectiveness & harmonization through Decentralization & SWAp Structural reform in grant system Capacity building

  3. Underlying Principles of LGCDP Social inclusion & gender equity Downward accountability Performance & equity-based funding Rights-based community-led development Balancing the demand & supply sides of development Harmonized & process driven approach (aligned with Paris Declaration)

  4. Major Instruments of LGCDP MCPM Information, education & communication Social mobilization LGAF Capacity grants & capacity development Topping up grants Blending government & TA inputs

  5. Programme Opportunities National coverage of 75 DDCs, 58 Municipalities & 3915 VDCs Serving all people in all corners but targeted at those most in need Working with all spheres of governance - public sector, private sector & civil society Supported by a unified approach from government & DPs

  6. AchievementsOutput One - Communities & Community Organisations Participate in the LG Process Social Mobilization guidelines approved District Social Mobilization Committee formed in 8 Districts SM monitoring underway 6

  7. Achievements - Output 2 Increased capacity of citizens, communities & marginalised groups to assert their rights & hold LBs accountable IEC guidelines developed & approved LGAF NC formed & active – Civil Society Representatives selected DAG training guidelines approved - Rs 1 lakh grant provided to all 75 DDCs CD of district Dalit & Janjati coordination committee guidelines approved - Rs 1 lakh grant provided to all 75 DDCs 8

  8. Achievements - Output 3LBs gain access to greater fiscal resources in equitable & appropriate ways • Topping-up grant • guidelines for DDC, VDC & Municipality approved • Around Rs 2.5 billion provided to 67 DDCs, 56 Municipalities & 2,749 VDCs • All 58 Municipalities assessed for MCPMs • Overview of finance system - MCPMs, block grant guidelines, allocation completed • QA manual for MCPM prepared & piloted in 5 DDCs & 4 Municipalities. 9

  9. Achievements - Output 4Appropriate CD services passed at all levels of LG service delivery Capacity Development manuals for all LBs designed & approved CD plan preparation service providers in all DDCs & Municipalities selected CD grant provided to all DDCs & Municipalities Over 3,000 LB staff, service providers & politicians oriented on LGCDP; CD plan; social mobilization; GESI; MCPM; environmental & social safeguards & M&E 10

  10. Achievements - Output 5LBs’ service delivery mechanisms & processes fine-tuned Sector conditional grant manual developed & approved Grant provided to 5 DDCs to implement sector conditional grant system EoIs for 28 activities assessed & RfPs for 9 issued SWAp background prepared 11

  11. Achievements - Output 6 Decentralisation policy enables more effective, transparent & accountable LBs Operation manual on implementation of social & environment safeguard measures approved Environment focal desk established in 75 DDCs & grants provided Guide for Environment Management Plan for infrastructure projects prepared DIMC meeting organized 12

  12. Achievements - Output 7Enhanced capacity of national government & institutions to support LBs MLD’s CD action plan developed & approved MLD’s HR section upgraded with IT support MLD’s GESI section established Exposure visits for MLD & LBFC staff Baseline survey of 60 districts completed Workshop on future structure & role of LBs in federal structure organized for legislature Policy paper on LBs’ role in federal system prepared 13

  13. Achievements - Output 8Programme implementation support PCU fully operational 11 National specialists appointed Cluster Units established in 5 regions & 5 Cluster Coordinators recruited District Facilitators recruited in 61 DDCs NDVS selected (100 volunteers) LGCDP Operations’ Manual drafted 14

  14. Achievements - Institutional mechanisms • Oversight Arrangements operational • NAC, NACSC, JFA, UNJPSC meetings held • Coordination arrangements operational • Thematic Groups functioning • Procurement evaluation teams established • Periodic review workshops underway • QAM & Annual Technical Review underway • Workplans & budgets prepared & updated

  15. LGCDP Continues to Expand JFA has two more signatories & preparation for 2 more completed UNIFEM is a new partner UNDP’s Poverty & Environment Initiative linked into LGCDP PASRA to be aligned with Social Mobilization Innovative Social Protection programme about to commence

  16. To Summarise • LGCDP’s structure all in place • Systems developed – management, funds’ flow, reporting, coordination • Orientation well underway • Guidelines developed, approved & disseminated • Enabling environment created thus LGCDP now poised to start achieving its intended results

  17. Planned Achievements by end FY 09/10 Output 1: • Capacity building of around 400 local service providers & DDC staff on social mobilization underway • Social mobilization implementation in 1,600 VDCs • 300 district Social mobilization committee members orientated • Operation manual for GESI mainstreaming Output 2: • IEC core message planned • Operationalize LGAF 18

  18. Planned Achievements by end FY 09/10 Output 3: • Blended block grant guidelines drafted • MCPM assessments of DDCs completed • MC assessments of VDCs underway • Quality assurance assessment of MCPM • Orientation on MCPMs well underway • Revenue mobilization training for LBs staff 19

  19. Planned Achievements by end FY 09/10 Output 4: • CD plan for 75 DDCs & 58 Municipalities being developed • Continuation of core & standard training to LB staff, political party, civil society, & user’s group – estimated 3,000 recipients Output 5: • LBs’ audit guidelines drafted • Update & refine M&E indicators 20

  20. Planned Achievements by end FY 09/10 Output 6: • LBs’ staffing policy review underway • Local environment policy proposals underway • Local environment policy guidelines • Train environment officers of LBs Output 7 • Existing LB M&E system reviewed • Baseline survey of local bodies • Operational manual of GESI strategy drafted • Capacity development plan of MLD drafted 21

  21. Activities deferred to next FY Output 3 • Preparation of LBs revenue operation manual • Introduce land tax in municipalities • Design revenue / expenditure computer software package Output 4 • Develop international standard PFM system and training package Output 5 • Pilot safety net & social assistance program 22

  22. Activities deferred to next FY Output 6 • Review decentralization & sector devolution policy • Formulate investment plan for grant expenses in the devolved sector • Preparation of action plan on sector devolution implementation Output 7 • Defining the role & functions of Fiscal Commission in the context of federalism 23

  23. Financial status JFA • Total budget of LGCDP for the FY 2009/10 – US$ 43.70 million • Total budget delivered as of 15 Nov 2009 – US$ 38.89 million UNDP • US$ 255,000 budget - US$ 210,000 expenditure UNCDF • US$ 292,000 budget - US$ 115,000 expenditure 24

  24. Challenges Monitoring & Evaluation of all VDCs Transforming LGCDP into SWAp Continuation & sustaining SM Empowering the local political mechanism Working with two fiscal year planning LB staff resources & time to absorb LGCDP Generalization vs LGCDP & LBs’ limitations Mobilizing the LGCDP for LB restructuring

  25. LGCDP’s Expectations • Creating more conducive & supportive environment by all stakeholders • Support & suggestions / feedback