Presentation Overview • Process Field Study design • Audit observation findings • Measure installation observation findings • Final inspection observation findings • Training needs, challenges, and strategies
Process Field Study Focus • Audit approach and implementation • Energy education delivery • Measure installation/operation of crews • Post-weatherization quality assurance inspection approach and implementation • Client interaction • Interactions among agency staff • Implications for management, procedures, and training
Agency Selection • Number of states per region based on WAP funding • State selection based on part of region and program size • Agencies selected to represent:
Social Scientist Role • Training • One week observation at agency • Weatherization manager and staff interviews • Observations • Client intake • Audit • Measure installation • Final inspection • Written agency summary report • Monthly update calls • Final debriefing
Weatherization Expert Role • Training • 3-Week Observations at Agency • Audit observation • Measure installation observation • Final inspection observation • Post Observation Data Entry • Monthly Update Calls • Final Debriefing
Audit Introduction Out of 104 observations completed.
Communication of Audit Findings • Audit write-ups do not convey educational opportunities • Work order not always clear or specific enough for installer to understand the desired outcome • Tools that improved information transfer • Pre-work walk through with installer • Attaching photos of critical areas to the work order • In process check-ups with the installers • Air sealing is a particular area for improved communication • Need for flexibility to change work order when problems are found during installations
Audit Findings Opportunities • Utilize energy bills • Increase client engagement • Identify client-specific opportunities for reducing energy use • Auditor understanding of pressure boundaries • Auditor understanding of testing purpose and procedures • Conduct worst case draft testing Strengths • Respect and concern for clients • Explanation of WAP program and process • Use of data collection forms • Auditors meet with contractors to explain audit findings and work scope
Process field study Measure Installation Observation findings
Measure Installation Preparation Out of 114 observations.
Measure Installation Findings Opportunities • Increased use of blower door when air sealing • Respect for clients’ homes (booties, covering furniture) • Crew member safety • Increased assessment of HVAC contractors • Explain CFLs when installing • Client education Strengths • Crew flexibility and dedication (above and beyond work scope) • Crew problem solving • Some very high quality work • Experienced HVAC contractors