Principles of Paving

Principles of Paving. Paver System Five. Grade Control Systems Tremendous benefits to the paving contractor: Increase efficiency and productivity Control Material Quantities Improve smoothness and rideability Increase jobsite safety. Control Sensors. Slope Control. Laser Control.

israel
Download Presentation

Principles of Paving

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Principles of Paving

  2. Paver System Five • Grade Control Systems • Tremendous benefits to the paving contractor: • Increase efficiency and productivity • Control Material Quantities • Improve smoothness and rideability • Increase jobsite safety Control Sensors Slope Control Laser Control = Theanswer for perfect, smooth paving? Sonic Control Smoothtrac Sonic Averaging System

  3. Paver System Five Good Paving Practice Grade Control Decent paving Control Sensors Control Sensors Control Sensors = + Fair paving = + Great paving! = +

  4. Principles of Paving • Good principles of paving must come BEFORE Grade Control • Paving is a TEAM project • Grade control is a great tool to help the paving team: • be more efficient • control material quantities • provide a smoother surface Train the entire TEAM!

  5. Paver Components • Asphalt Paver • The paver has two primary components: • Tractor • Screed

  6. Paver Tractor • Tractor has two primary functions • Material Handling • Forward Movement

  7. Paver Tractor • Asphalt distribution • The paver typically receives the asphalt: • directly from a truck • by a pickup machine (windrow elevator)

  8. Paver Tractor • Asphalt distribution • The asphalt is received into the paver’s hopper • Hopper is a holding station for the asphalt • The operator tilts the hopper to deliver material into the feeder conveyor

  9. Paver Tractor • Asphalt distribution • Feeder conveyors distribute the asphalt to the augers • The augers spread the asphalt in front of the screed • End gates contain the material at the outer edge of the screed

  10. Screed Components • Paver Screed • Function of the screed is mat laydown • Screed has several components

  11. Screed concept • The screed floats on the asphalt as it passes under the screed plate • The screed will “self-level” and maintain a thickness based on the forces acting on the screed. Floating, Self-Leveling Screed

  12. Screed Concept • The desired thickness is controlled by the screed angle of attack • As the angle of attack is increased or decreased, the screed will float up or down changing the thickness Screed angle of attack… …controls mat thickness …

  13. Changing Angle of Attack • The angle of attack can be changed by: • The manual crank • The hydraulic cylinder at the tow point

  14. Screed Concept If the angle of attack is… increased, decreased, Mat thickness decreases Mat thickness increases

  15. Floating, Self-Leveling Screed • The paver tractor, and therefore the screed tow point, travel over the existing “rough” surface • The floating screed doesn’t react immediately to the variations in the tow point path • The floating screed seeks it’s own level, smoothing out small humps and bumps.

  16. Floating, self-leveling screed • The floating screed naturally cuts off high spots and fill in low spots. Cuts off high spots Fills in low spots

  17. Screed Reaction • Tow point “step disturbance” and screed reaction • Two point is changed by a unit of one (1) • Net effect = the angle of attack has been changed

  18. Screed Reaction • Example of tow point “step disturbance” and screed reaction • Two point is changed by a unit of one (1)

  19. Screed Reaction Example of change in angle of attach by turning manual crank and screed reaction.

  20. Checking Mat Depth • Goal is to “average” a particular paving thickness • Always check several places, horizontally and laterally

  21. Adjusting Mat Depth • Once an adjustment is made – GIVE THE SCREED TIME TO REACT!

  22. Adjusting Mat Depth Goal – Provide smoothness and compaction, while hitting target tonnage for entire project! • Determine average depth by measuring tons/mile • Make small adjustments based on calculation

  23. Floating, Self-Leveling Screed Left alone, the screed will self-level and assume a thickness based on forces that are acting on the screed. • What are these forces?

  24. Forces Acting on the Screed There are four major forces acting on the screed

  25. Forces Acting on the Screed • If any one of these forces change, the mat thickness will change. • But in “real life” job applications, these forces cannot always remain constant.

  26. Tow Point Force If the forward speed… increases; mat thickness will decrease decreases; mat thickness will increase Goal - Non-stop, continuous paving!

  27. Tow Point Force Goal - Non-stop, continuous paving! • Determine paving speed based on plant supply in tons/hour • Regulate trucks to the paving supply and operation, not the paving operation to the trucks Plant supply = 210 tons/hour Paving speed = 25’/minute

  28. Tow Point Force Maintain smooth truck exchange! Bump in matat every truck exchange (probably “caused by faulty grade control!”)

  29. In Motion Switches • While stopped waiting for trucks, the screed will settle slightly • Screed goes down, the tracker will also go down slightly

  30. In Motion Switches • Grade control would want to drive the tow cylinder up to compensate • The paver’s In-Motion switch stops the valve electrical signal • A timer initiates the electrical signal after the paver is in-motion X

  31. Head of Material Force Maintain a CONSISTANT head of material

  32. Head of Material Force Maintain a CONSISTANT head of material

  33. Head of Material Force Maintain a CONSISTANT head of material

  34. Reaction of Material Force • Mix Characteristics • Gradation • Segregation • Mix Temperature

  35. Weight of the Screed Force Compaction Force = Pounds per square inch

  36. Weight of the Screed Force • Compaction Force = Pounds per square inch • How can the weight force change? (lbs per square inch) • People climbing on and off the screed can have a small effect on overall screed weight

  37. Weight of the Screed Force • Screed extension • Changing screed width changes the compaction force - Lbs per square inch

  38. Roller Compaction • Good rolling practice is critical to the quality of the mat

  39. Roller Compaction • A freshly laid, smooth mat will reflect some of the original surface after rolling • Quality of the base being paved affects smoothness • Multiple lifts help to minimize these effects

  40. Mechanical condition of the Paver • The paving machine itself needs to be in good shape and adjusted correctly • Feeder system • Hopper, flight chain operation and adjustment, augers, etc. • Operation and adjustment of feeder controls • No excessive wear on screed components • Screed plates • Thickness control screws, bearings, and bushings • Screed pivot point bushings • Screed adjustment • Strike off plates • Screed flatness • Screed extensions adjusted properly, elevation and slope

  41. Paver System Five Good Paving Practice Grade Control Decent paving Control Sensors Control Sensors Control Sensors = + Fair paving = + Great paving! = +

  42. Paver System Five • Tow point is smoothly controlled to a desired path: • Curb • Stringline • SAS smoothing out existing surface Then let the floating, self-leveling screed do it’s job!

  43. Best Paving Practices • Good mechanical condition of the paver • Minimize changes in the natural forces on the screed • Non-stop, continuous paving • Good, smooth truck exchange • Constant paving speed • Constant head of material • Consistent mix characteristics • Good rolling techniques • Good quality of sub-base • Understand proper setup and operation of Grade Control

  44. Principles of Paving