An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Recent Advances in ChinaGrid Project Hai Jin Huazhong University of Science and Technology Wuhan, China hjin@hust.edu.cn

  2. Huazhong University of Science and Technology, located in the central of China, was founded in 1953, and ranks the TOP 5 universities in China.

  3. Nation-wide Grid Projects in China • China National Grid – CNGrid (Ministry of Science and Technology ) • China Education and Research Grid – ChinaGrid (Ministry of Education) • China Science Grid Project (National Science Foundation) • Two group efforts working on the grid middleware platform • Group 1: ICT/CAS, HUST, Peking U., Tsinghua U., Xi’an Jiaotong U., and Shanghai Supercomputer Center (CSGrid project) • Group 2: Beihang U., Peking U., Tsinghua U., NIC/ CAS, NUDT (China Research and Development Environment Over Wide-area Network,CROWN)

  4. ChinaGrid in a Nutshell • China Education and Research Grid • Funded by Ministry of Education • As the pilot grid application supported by National 863 Hi-Tech R&D program • Based on CERNET (China Education and Research Network) • First Phase • From 2003-2005 • 12 key universities as initiative • More than 6Tflops w/60TB • 20 key universities now

  5. About CERNET • Second largest IP backboned network in China • 36 PoPs cover all the province capitals • The network backbone is 2.5-10Gbps DWDM • Cover more than 1,500 universities/colleges in about 200 cities • About 20 million users • Many universities have their own campus network in China

  6. State-of-the-art of CERNET-1

  7. ChinaGrid (The First Phase)

  8. ChinaGrid (till now)

  9. ChinaGrid Mission • Campus grid platform • Common platform for ChinaGrid • Grid application platform and representative grid applications • Image processing grid • Bioinformatics grid • Course on-line grid • Computational fluid dynamic grid • Large scale information processing grid

  10. HUST:0.8Tflops, 5TB THU:1.3Tflops, 20TB PKU:1.5Tflops, 10TB BUAA:0.7Tflops, 10TB SCUT:0.9Tflops, 20TB SJTU:0.5Tflops, 9TB SEU:1.0Tflops, 19TB XJTU:0.1Tflops, 2.5TB NUDT:0.2Tflops, 5TB NEU:0.8Tflops, 5TB ZSU:1.3Tflops, 10TB SDU:1.3Tflops, 18TB NWPU:0.4Tflops, 2TB ZJU:0.6Tflops, 3TB FUDAN:1.8Tflops, 6TB TONGJI:0.2Tflops, 1TB USTC:1.2Tflops, 5TB UESTC:0.3Tflops, 2TB RUC:0.1Tflops, 0.5TB LZU:0.3Tflops, 1TB Campus Grids and their Computing Power and Storage Capacity ChinaGrid:>15Tflops, >150TB

  11. SJTU PKU XJTU NEU ZSU SCUT HUST BUAA NUDT SEU Remote Fluid Image education THU dynamics SDU processing grid grid Massive grid information Bioinformatics processing grid grid ChinaGrid Supporting Platform (CGSP) High performance computing environment (campus grid) Layered Infrastructure of ChinaGrid

  12. What’s CGSP? • ChinaGrid Supporting Platform, a grid middleware for ChinaGrid • Follow the WS-Resource Framework (WSRF) and Open Grid Service Architecture (OGSA) • Beta version was announced last October at GCC’04 in Wuhan • CGSP 1.0 was released Jan. 10, 2005 • Developed by the joint working group from HUST, THU, PKU, BUAA and SJTU

  13. Status of CGSP 1.0 • CGSP download more than 300 times • Support three major grid applications of ChinaGrid • Installed in 12 universities as campus grid environment

  14. ChinaGrid Supporting Platform Portal: Grid entry for submitting & monitoring job, querying resources’ info, user management and accounting etc. Grid Developing Environment: a set of toolkits including portal development tools, resource encapsulation tools, programming tools and job generation tools etc. Information Center: the manager of resource & service information Uniform Management: a set of managers including job manager, data center, domain manager and service container Security: Identity authentication and mapping, service and resource authorization, secure transferring etc.

  15. Data Center (CGSP) Proxy (CGSP) Job Manager (CGSP) Resource-Index (CGSP) JAVA WS Core (WSRF) MDS2 MetaData-Man (CGSP) WorkFlow (CGSP) HyperService (CGSP) C WS Core (WSRF) WS-Index InterDomain (CGSP) RemoteDeploy (CGSP) Portal SDK (CGSP) Topologic (CGSP) HotDeploy (CGSP) Programming Toolkits (CGSP) GT3.9 and CGSP GSI New GridFTP Pre-WS GRAM WS-Security RFT WS-GRAM CSF (contribution) CAS RLS Python Bindings (contributed) SimpleCA OGSI-DAI Authz Framework XIO pyGlobus (contributed) Security Data Management Resource Management Information Services WS Core

  16. Portal Grid Developing Environment Portal development tools Resource encapsulation tools Programming tools (GridRPC/GridPPI) Job generation tools Management tools Installation tools Information Center Domain Manager Service management Resource management Fault-tolerance mechanism Domain info management User management Identity mapping Service matching Topology management Quality of service management Metadata description Status monitor Negotiation policy Job Manager Data Manager Security Job monitoring Job remote-deploy Job submission Certification authority Uniform access entry Work flow management Job scheduling Service support Identity certification Metadata manager Proxy management Service Container Remote&hot deploy Service monitor Storage resource manager Single sign-on Node resource monitor Batch job service Replica catalog Security management of service and container GT3.9.1 core Life cycle Service group Notification Storage agent Base fault Resource property Resource access control CGSP in Detail

  17. Working Flow of CGSP

  18. AG4ChinaGrid:GridAsia 2005

  19. http://www.chinagrid.edu.cn

  20. Bioinformatics Grid

  21. BioGrid Applications • Protein target selection for rice genome • Multi-sequence alignment for ganoderma family • Gene joint for white mice • Cardiovascular disease research

  22. Image Processing Grid

  23. ImageGrid Applications • Three-dimension reconstruction of digital virtual human being (HUST) • Medical image diagnosis (ZSU) • Remote sensing image processing(NUDT)

  24. CFD Grid

  25. Pilot Applications based on CFD Grid • Shanhai JiaoTong University: Aircraft genetic optimization design system • Xi’an JiaoTong University: Parallel algorithm for molecular dynamics • Southern China University of Technology: Simulation and optimization techniques for metal powder figuration process • Northeast University: Large scale geological disaster forecasting system • Southeast University: Computational electromagnetism applications in airplane and automobile design

  26. Course On-line Grid

  27. Course Resource Contribution • Number of courses: 233;Number of hours: 2566

  28. Usage Survey User IP distribution(2004/08/27-2005/01/16) At least so many people use course-online grid Total number of access Numbers of independent IPs:25,807;Total number of HTTP GET:12,569,855

  29. Massive Information Processing Grid

  30. University Digital Museum Grid (UDMGrid)

  31. Total Investment of China to Implement Initial Informalization by 2020 • Computer 3.900Trillion RMB • Internet Host and Systems 117.000Trillion RMB • Communication 6.100Trillion RMB • Digital TV 1.950Trillion RMB • Total 128.950Trillion RMB • It is necessary to lower down the cost of informalization greatly by using resource sharing and cooperative working

  32. Thanks!