September 2008 QSEC auction - Allocations

September 2008 QSEC auction - Allocations. Transmission Workstream 04.12.08. Introduction. Following November workstream, some Shippers expressed an interest in the 2008 QSEC allocation results Aggregate results were published 14 November on Gemini, National Grid website and via Joint Office

ivo
Download Presentation

September 2008 QSEC auction - Allocations

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. September 2008 QSEC auction - Allocations Transmission Workstream 04.12.08

  2. Introduction • Following November workstream, some Shippers expressed an interest in the 2008 QSEC allocation results • Aggregate results were published 14 November on Gemini, National Grid website and via Joint Office • Now taking the opportunity to run through these results and answer any questions you may have

  3. Quick reminder - QSEC bidding • Demand driven price • Auction can close early if stability groups remain unchanged between interim bid windows – difficult to predict when this will happen • This year’s auction closed after interim bid window 2 • Price Step (P0) = 90% baseline – minus anything sold in previous auctions + any unsold incremental • Price Steps P1 to P20 = Incremental Capacity offered (Available NTS Entry Capacity) • Incremental prices are based on the long run incremental cost of providing additional capacity above the obligated level

  4. Allocations Overview

  5. Allocations Overview (cont…)

  6. Incremental Capacity Release - Caythorpe • Incremental signal received for 90 GWh • Obligated incremental until Dec 2015 • Obligated Incremental allocated at price step P6 = 0.0094 p/kwh • After 5 years Obligated Incremental then becomes baseline • April 2020 to December 2024 allocated at P0 (along with some individual quarters earlier on in the transaction period) • Total revenue received = £19,305,720

  7. Non Obligated Incremental Capacity Release - Easington • Allocations made of both Baseline and non obligated capacity • Aggregate Volume of Capacity sold 1,284,329,102 kWh • Total Revenue received - £11,297,469 • Baseline Capacity Sold • 1,060,599,012 kWh • Revenue - £8,984,488 • Incremental signal received for some quarters : • Where NPV test not passed, National Grid can choose to release non obligated incremental inline with UNC section B2.6 (a) (iii) • National Grid released non-obligated incremental capacity at Easington in Q1 2011, Q1 2012, Q1 2013, Q1 2014 and Q1 2015 • Total sold - 223,730,079 kWh • Revenue - £2,312,981

  8. Conclusion • Currently the next QSEC auction should be held, in accordance with Code, in September 2009 • 2 UNC modification have been raised on Auction timing: • Modification Proposal 0230 is seeking to change this so that the next QSEC auction would be held in March 2010 • Modification Proposal 230A seeks to maintain existing September QSEC Auction in September 2009 prior to transition to a March 2010 Auction • Full guide to the QSEC auction is available on National Grid’s website with contact details for the Capacity Auctions team and also for independent consultants, should you wish to obtain advice on bidding strategies • All of the information in today’s presentation is taken from the aggregate QSEC results published on National Grid’s website • http://www.nationalgrid.com/uk/Gas/Data/CA/reports/Long+Term+System+Entry+Capacity+%28LTSEC%29.htm • ANY QUESTIONS?