Webre – Wells Economic Study. LTTIWG Meeting – October 28, 2008. Douglas Bowman, PE Lead Engineer, ICT Planning 501-688-1640 dbowman@SPP.org. Webre-Wells Economic Study. 2017 Case Study model includes Base Plan and Supplemental Upgrade projects 3 Transmission Upgrades studied
E N D
Webre – Wells Economic Study LTTIWG Meeting – October 28, 2008 Douglas Bowman, PELead Engineer, ICT Planning501-688-1640dbowman@SPP.org
Webre-Wells Economic Study • 2017 Case • Study model includes Base Plan and Supplemental Upgrade projects • 3 Transmission Upgrades studied • Analysis uses generic data for generating facilities, based on RDI, POWERdat, supplied by ABB. • Fuel price forecasts obtained from the Energy Information Administration (EIA)
Analysis Tool - Gridview • Used for generation and transmission expansion planning, market simulation, and production cost modeling • Engine – Security Constrained Optimal Power Flow • Dispatches generation to minimize production costs while observing security constraints • Simulates economic operation of power system • Chronological simulation from hours to years • Identifies areas and durations of power system congestion
Richard-Webre 500kV Line New Richard – Webre 500kV Line
138kV Upgrades Upgrade Wilbert – Champagne 138kV Upgrade Terrebone – Gibson 138kV
Wilbert-Champagne-Wells 230kV Line Wilbert – Champagne – Wells 230kV
Acadiana Acadiana Upgrades Wells –Labbe 230 kV Labbe – Bonin 230 kV Richard – Sellers 230 kV Sellers – Labbe 230 kV Sellers Sellers– Moril 230 kV Sellers – Meaux 230 kV
Option 4 Congestion Reduction 9/16/2017 – 10/11/2017 LP&L South
Option 12 Congestion Reduction – 9/16/2017 – 10/11/2017 LP&L South
Option 13 Congestion Reduction – 9/16/2017 – 10/11/2017 LP&L South