1 / 18

Network Monitor

iyelle
Download Presentation

Network Monitor

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. MEPAV 2010 CONFERENCE AMI MANASSASGregg S. Paulson, P.E. Deputy Director of Electric Utilities City of Manassas VA May 28, 2010 Customer Portal Internet Network Monitor

  2. MEPAV 2010 CONFERENCE AMI (Smart Grid) MANASSASAgenda • Why AMI in Manassas? • Load Management • Expenses/Savings • AMI Deployment

  3. The AMI Decision?? • AMI is the foundation of the “Smart Grid” and fits well into our Five Utility Strategic Plan Focus Areas • Affordable rates for City Customers • AMI helps keep rates low by reducing Supply Capital and O&M costs and provides for future TOU rate structures • Safe, Adequate, and Reliable Service • Improves outage notification and response time, helps proactively identify system disturbances improving reliability • Quality and Safe Work Environment • Improves Safety by limiting exposure of personnel to hazards of reading and connecting/disconnecting service. • Excellent Customer Service • Provides faster response to customer requests, more accurate meter reads and billing statements • Strong Environmental Stewardship • Reduces energy resource and fuel needs thereby reducing GHG’s

  4. Why AMI in Manassas? • Demand Reduction Strategies • Generation Peak Shaving • Voltage Reduction • Load Management

  5. AMI Benefits • Purchased Power Cost reduction • Emissions Footprint Reduction • Position the Utility for the Future • Advantage of New Technologies (HAN) • New Legislation & Regulations • Operational Benefits • New Business Opportunities

  6. AMI Benefits • Purchased Power Cost Reduction • Load Management/Demand Response • Gain increased participation in Load Management • Verifiable impact of Load Management • 1.5KW+ reduction in demand per participant per month • $16.92 per KW per Month under the current contract • Expected to change under new contract in 2011 ($17.50) • Operational Cost Benefits • Reduced Annual O&M costs • Meter Reading Costs • Avoided cost of Distribution Improvements • Customer Service Benefits • Outage Management

  7. AMI/Load Management

  8. AMI/Load Management

  9. AMI/Load Management • Customer Benefits • No cost to Participate • Provides Daily Usage Detail • Ability to Control Appliances • Utility Cost Savings • Credit on Your Bill • Ability to Manage Costs • Reduces GHG Emissions • Free Home Energy Audit

  10. Load Reduction Savings Updated New Contract

  11. Electric Expenses

  12. Electric & Water Savings

  13. Electric & Water Savings/Expenses

  14. Electric & Water Savings/Expenses

  15. Advanced Metering Infrastructure Wireless mesh meter-node network Utility Provided Applications Network Manager Smart Thermostat MDM CIS Billing Application Server Outage Management System Network Manager Client Collector Customer Portal Database Database Web Applications Application Server Load Control Device

  16. AMI Deployment • Pilot Deployment • Point of Woods East & adjacent areas • 450 Residential & 50 Commercial Customers • Goal of 50 Thermostats & 50 Water Heaters • Over the next three months (June-Aug) • Full City Wide Deployment • 15,500 Electric & 12,500 Water Meters • Goal of 3000-5000 LM Devices • Two Year Full Deployment (2010-2012)

  17. Summary • AMI is the Foundation of the Smart Grid • AMI LM/DR allows partial recovery of lost Generation Benefit • Many Operational Benefits • Allows New Rate Structures • Water Meter Expense recovered through Lost Revenue Recovery • Electric Expense recovered through LM/DR and O&M savings • Payback in Two Years After Full Deployment • Utility Commission Approved Pilot Award in March 2010 • City Council Approved Pilot Award in April 2010

  18. QUESTIONS?

More Related