210 likes | 553 Views
ROT systems ROTARY INCINERATORS G.&G. IMPIANTI Sas of Ing.Gallarati Carlo &C. For municipal waste big incineration plants (MW) Hospitals and medical waste plants (HW) Industrial special - hazard waste plants (IW) RDF, pellet , fluff exploitation plants
E N D
ROT systemsROTARY INCINERATORSG.&G. IMPIANTI SasofIng.GallaratiCarlo &C. Formunicipalwaste big incinerationplants (MW) Hospitals and medicalwasteplants (HW) Industrial special - hazardwasteplants (IW) RDF, pellet, fluff exploitationplants fittedwithautomaticloading, ashunloading, stack gas cleaning system at CEE norms, turbogeneratorsforelectricenergy and heatrecovery www.ing-gallarati.com
INCLINED FURNACES SERIES ROT • Maintechnicaladvantages • Rotatingfurnacesreach a complete material grinding and thermaldestruction, obtainingcompletelycarbonized and roastedash • Ashiscompletelyroasted and stabilizedbecomingfullyinertized • Ashis pre-melted and vetrified and isunloadedinto a water channel (redler) whereitisviolentlyquenched and reducedintovitreousshivers, tobeclassifiedasinertized material and to pass the solute cessionlabtests. • The ROT furnaces can beloadedwithdifferentwastetypesalsomixedtogetheroffering the greatestpossibleloadingflexibilityof the incinerationplant and reaching the maximumpossiblequantityofelectricenergyproducted and aswellproducing a notablealways positive economicincome, rendering the bankfinancementamortizablewith high profitability. • ROT furnacesoffer a long operative life withoutheavymaintenancecosts. • ROT furnaces are easy tobeconducted and with a limitednumberofoperators www.ing-gallarati.com
OTHER NOT LESS IMPORTANT ADVANTAGES • The civilworksnecessaryfor the plant, at chargeof the client, are limitedto the minimum (itisnecessaryonly a shedded building with a plainbasement concrete slab) • The soilsurfacenecessaryfor the plantissubstantiallycontained • ROT furnaces are a long termexperiencedtechnology and offer a veryeffordablesolutionof the wasteproblemwithoutencountering bad surprises. • ROT furnacesoffer full certaintyof the economicreturn (pay-back) • We can show many ROT furnaceunitsworking, withvery low short yearly down periods, since a long term, with full evidence the emissionstoremainalwaysbelow the permittedlimitsby the local air pollutionauthorities (ARPA), withofficialanalysiscertificationsexecutedby the State authority itself (stack gas AFS depurationplantsbyIng.Gallarati) • The efficiency in heat and electricenergyrecoveryiscomparablewiththatobtainablewithother more complex and expensiveplants, butwithvery low costmaintenance and short shut down period. www.ing-gallarati.com
ORGANIZATION CHART OF G.&G. IMPIANTI Sasdi Ing.Gallarati Carlo & C. www.ing-gallarati.com
ROT PLANTS INFORMATIVE MATERIAL Informative material about ROT plants, in form of graphs and tables is attached and is freely downloadable from the following internet web-sites: www.ing-gallarati.com For further information please contact: Information contact: G&G IMPIANTI Sas of ING.GALLARATI CARLO & C. Local workshop: via deiMarinoni43 - CAP 27040 – city of CIGOGNOLA PV - ITALIA tel. & fax.: ++39.385.250421 e-mail.: ing.gallarati@gmail.com / info@ing-gallarati.com www.ing-gallarati.com
FORNUCE ROT CC - COUNTER CURRENT • ROT furnace are realized in manysizes • The incinerationcapacityrangesfrom 0.5 t/h to 20.5t/h (ROT150) • The ROT17 furnaceasidehas a capacityof1 t/h as HW with LCV=4500 Kcal/Kg www.ing-gallarati.com
ROT17 CC plant - city hospital of Lecce • ROT17 plantof the city hospital USSL1, hospital VITO FAZZI – Lecce (Italy) www.ing-gallarati.com
ROT17 EC CO-CURRENT - city of Puto (ex Jugoslavia – duringmounting) • ROT 17 EC (co-current) is more adaptedforvery dry wastewith high LCV (i.e. hospital waste) (LCV=4500 Kcal/Kg) • Hereaside a ROT17 EC plantduringmountingphase www.ing-gallarati.com
HYDRAULIC LOADING MACHINE OF A ROT15CC FURNACE www.ing-gallarati.com
Stackeffectfrom a ROT60 furnace (NZEP plant) (nearto zero emissionsplant) www.ing-gallarati.com
Stackeffectfrom a ROT15 CC furnace www.ing-gallarati.com
Inertizedash, completelyroasted and exhausted www.ing-gallarati.com
LAY-OUT SAMPLE OF A ROT17 C.C. PLANT www.ing-gallarati.com
LAY-OUT SAMPLE OF A ROT10 EC PLANT FOR HOSPITAL WASTE - 500 KG/H www.ing-gallarati.com
Lay-out of a big incineratorcenter for a largemunicipalityfittedwithNr.4 ROT 150 parallel www.ing-gallarati.com