150 likes | 289 Views
Strategies & Tactics for Results. Show Me the Money. Prepared By C. Paul Oberg, CMC, CPCM EPAC Software Technologies, Inc. www.epacst.com. Real Dollars can be realized through…. Labor Utilization / Productivity Materials Management Equipment Productivity.
E N D
Strategies & Tactics for Results Show Me the Money Prepared By C. Paul Oberg, CMC, CPCM EPAC Software Technologies, Inc. www.epacst.com
Real Dollars can be realized through…. • Labor Utilization / Productivity • Materials Management • Equipment Productivity
Savings Through Labor Productivity • Reduced Labor Requirements • Improved Utilization • Reduced Over-time
Strategies for Improving Labor Productivity • Reduced Labor Requirements • Rationalize PM frequencies • Outsource • Planning and Scheduling • Improved Utilization • Planning and Scheduling • Priority System • Reduced Over-time • Planning and Scheduling • Backlog Management
Savings Through Materials Management • Reduced Obsolescence • Reduced Inventory Levels • Better Pricing • Reduced Inventory Adjustments
Strategies for Improving Materials Management • Reduced Obsolescence • Improved ECO Procedures • Standardization of Parts • Reduced Inventory Levels • Outsource • Standardization of Parts • Consolidation of Parts • Reorder Point Review
Strategies for Improving Materials Management • Better Pricing • Contract Pricing by Commodity Codes • Improved Forecasting • Reduced Inventory Adjustments • Storeroom Security • Cycle Counting
Savings Through Equipment Productivity • Increased Uptime • Improved Quality • Improved Reliability
Strategies for Improving Equipment Productivity • Increased Uptime • Breakdown Analysis • Failure Analysis • Rationalize PM Frequencies • PDM • Planning and Scheduling
Strategies for Improving Equipment Productivity • Improved Quality • Failure Analysis • PM • PDM • Breakdown Analysis
Strategies for Improving Equipment Productivity • Improved Reliability • PM • PDM • Failure Analysis • Breakdown Analysis
Measuring Improvements • Labor Utilization / Productivity • Labor Distribution • Direct vs Indirect Utilization • Work Completed vs Backlog • Schedule Compliance • PM Compliance
Measuring Improvements • Materials Management • Inventory Turns • Inventory Value • Stock Outs • Obsolete Dollars • Slow Moving Items • Inventory Accuracy
Measuring Improvements • Equipment Productivity • Uptime • Downtime by Failure code • Scrap Attributable to Maintenance • Machine Efficiency
Success • “Success is a Choice” Rick Pitino