1 / 2

STRATEGY OF ATOMIC POWER DEVELOPMENT IN RUSSIA

STRATEGY OF ATOMIC POWER DEVELOPMENT IN RUSSIA. STAGES OF STRATEGY ON NPP EXPLOITATION Till 2010 Safety and efficient exploitation of operating power units Prolongation of period of exploitation Till 2030

jace
Download Presentation

STRATEGY OF ATOMIC POWER DEVELOPMENT IN RUSSIA

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. STRATEGY OF ATOMIC POWER DEVELOPMENT IN RUSSIA STAGES OF STRATEGYON NPP EXPLOITATION Till 2010 • Safety and efficient exploitation of operating power units • Prolongation of period of exploitation Till 2030 • Replacement of decommissioned NPP units of I-st and II-d generation by nuclear power installations of III-d generation

  2. SCALE OF DECOMMISSIONING 12 NPP UNITS OF I-st GENERATION ARE PLANNED FOR DECIOMMISSIONING • 3 and 4 Power units of Novovoronej NPP • 1 and 2 Power Units of Cola NPP • 1 and 2 Power Units of Leningrad NPP • 1 and 2 Power Units of Kursk NPP • 1 - 4 Power Units of Bilibinsk NPP developped and created before issue of main norm documents on safety of atomic power PREPARED FOR DECOMMISSIONING • 1 and 2 Units of Beloyarsk NPP • 1 and 2 Units of Novovoronej NPP

More Related