An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. MAMM Site Review Acquisition Plan

  2. MAMM Acquisition Goals • Cover high priority areas with F1 beam. • Complete Ascending and Descending coverage. • Minimize use of onboard recorder • maximize real-time link to McMurdo GRS. • 3 identical cycles to obtain interferometric coverage.

  3. High Priority F1 Target Areas

  4. SAR, OBR & Station Usage • Total SAR on-time: 1506.5 min. • RTM: 910.5 min • OBR: 596.0 • Total Number of Data Acquisitions: 818 • RTM: 532 • OBR: 286 • Fairbanks: 105 • Gatineau: 104 • Prince Albert: 77

  5. Mission Results • Cycle-1: 824 scheduled • 782 acquired • 42 lost • Cycle-2: 829 scheduled • 773 acquired • 56 lost • Cycle-3: 830 scheduled • 817 acquired • 13 lost

  6. Cycle-1 Ascending Cycle-1 Descending

  7. Cycle-2 Ascending Cycle-2 Descending

  8. Cycle-3 Ascending Cycle-3 Descending

  9. Cumulative Ascending

  10. Cumulative Descending