1 / 6

Sergio Paulo Packer

Inmetro Brazilian Aerospace Accreditation Program RMC Meeting Boston, MA July,19-20/11. Sergio Paulo Packer. 2011 Overview AQMS Accreditations • 4 NBR 15100 (equivalent to AS9100) AQMS Applicants • none AQMS Suspensions • none AQMS Withdrawals • none.

jacie
Download Presentation

Sergio Paulo Packer

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Inmetro BrazilianAerospace AccreditationProgram RMC Meeting Boston, MA July,19-20/11 Sergio Paulo Packer

  2. 2011 Overview AQMS Accreditations • 4 NBR 15100 (equivalent to AS9100) AQMS Applicants • none AQMS Suspensions • none AQMS Withdrawals • none

  3. Complaints/Appeals Complaints against Aerospace CBs and Inmetro • Never had complaints up to now Complaints can be addressed to ouvidoria@inmetro.gov.br or in the web site http://www.inmetro.gov.br/ouvidoria Appeals against Aerospace CBs and Inmetro • Never had appeals up to now Appeals must be addressed directly to the cgcre@inmetro.gov.br

  4. Auditsplannedto 2011 ACB – AccreditedCertificationBody CI – Numberofvalidcertificationsissued (NBR 15100:2004) AEA – NumberofAerospaceAuditorsemployed (1) Recognizedby RMC through RAB

  5. Transition AS 9100:2009 • (NBR 15100:2010) • Accreditation Bodies (ABs) • Inmetroassessors to complete IAQG Sanctioned AATT training on the week of August 29(to be confirmed). • Verification of the CB’s transition process scheduled for the next office assessment • All 4 CBs completed the transition in OASIS before July 1st , 2011 • (no withdrawal)

  6. Contacts Inmetro Home Page www.inmetro.gov.br Cgcre’sCoordinator 55 21 2563-2838 - Marcos Aurélio Lima- malima@inmetro.gov.br Division for theAccreditationofCertificationBodies (Dicor) 55 21 2563-2870 – Aldoney Freire Costa - afcosta@inmetro.gov.br 55 21 2563-2872 – Sergio Paulo Packer- sppacker@inmetro.gov.br

More Related