70 likes | 172 Views
AKT Project Structure Projects, TIEs and IFDs Austin Tate 25-Jan-2002. Programme “Flows”. Transfer Results “Up”. Transfer Requirements “Down”. “Insertion” or Production Projects. Integrated Feasibility Demonstrators (IFDs). Technology Integration Experiments (TIEs). Individual Project
E N D
AKT Project Structure Projects, TIEs and IFDs Austin Tate 25-Jan-2002
Programme “Flows” Transfer Results “Up” Transfer Requirements “Down” “Insertion” or Production Projects Integrated Feasibility Demonstrators (IFDs) Technology Integration Experiments (TIEs) Individual Project Experiments & Results
Programme Roadmap Applications, Testbed Targets, etc. Integrated Feasibility Demonstrators (IFDs) Integrated Feasibility Demonstrators (IFDs) Technology Integration Experiments (TIEs) Research Thread - 1 Research Thread - 2
Further Information • http://www.aiai.ed.ac.uk/~bat/roadmap.html • http://www.aiai.ed.ac.uk/~oplan/documents/1998/98-pakm98-roadmaps.pdf