1 / 2

One of the best Lawn Treatment in Kingston upon Thames

Looking for a Lawn Treatment in Kingston upon Thames? Then look further to Sterling Lawn Solutions.Sterling Lawn Solutions is a family run business and was founded in 1999.We specialise in all year round lawn care, lawn renovation and turfing so if youu2019re looking for a new lawn or your current lawn is looking tired we can definitely help you so please feel free to call or text us and we will be happy to pop round and give you a free estimate. To know more visit us now.

Download Presentation

One of the best Lawn Treatment in Kingston upon Thames

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Brickwork Detailed Specification The kind and quality of the job, the components to be utilized, and the execution are all specified in the brickwork requirement. It is critical for the task to be completed. The expense of the job is mostly determined by the job specifications. So, let's look at a brief description of brickwork and way it’s done stepwise. Brickworks romford All of the bricks must be made from excellent, pure soil. The brick must be 19*19*9 cm in size. The bricks must be properly reddish in color and well-

  2. burned. The bricks must have straight edges and level rectangular faces with parallel diameters. When placed from a height of at least 1 meter, the brick must not crack. Sand: It must be organic sand that is hard, powerful, and long-lasting. The sand must be clean and free of shells, alkali, salt, dust, silt, and other contaminants. Cement: Pure portland cement with normal standards is required. A minimum compression capacity of 175 kg/cm2 is required. The cement's early setting time must not be shorter than 30 minutes, and the total fixing time must not exceed 10 hours. Water: Alkaline, salt, and other acidic materials must be absent from the water. Builder upminster The cement sand plaster proportion can range from 1:3 to 1:6 or as specified. It equates to one part cement to three parts sand or one part cement to six sections sand.

More Related