1 / 4

RKAP 2012 PLN BATAM

RKAP 2012 PLN BATAM. Rapat Direksi 12 Juli 2012. Asumsi RKAP 2012. Hasil Simulasi. Catatan :. BUMD gas masuk 5 BBTUD sehingga tidak terkena TOP gas Komposisi Coal diperkecil , dan gas diperbesar dgn memanfaatkan gas baru

Download Presentation

RKAP 2012 PLN BATAM

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. RKAP 2012 PLN BATAM RapatDireksi 12 Juli 2012

  2. Asumsi RKAP 2012

  3. HasilSimulasi

  4. Catatan : • BUMD gas masuk5 BBTUD sehinggatidakterkena TOP gas • Komposisi Coal diperkecil, dan gas diperbesardgnmemanfaatkan gas baru • Penjualankwh 20 jutadibawahasumsipusat, dan 49 jutadiatasneracaenergiRen

More Related